Chief Engineer (Distribution) JPDCL Jammu has told that for re-conductoring and structure fitting, the power supply to Mandal and its adjoining areas will remain affected on October 21 and 23 from 8 am to 2 pm.
Similarly, to conduct the othet works, the power supply to Sunderpur and its adjoining areas will remain affected on October 21 from 8 am to 1 pm. The power supply to Makwal and its adjoining areas will remain affected on October 22 from 8 am to 1 pm. Same for the power supply to Prahladpur and its adjoining areas will remain affected on October 23 from 8 am to 1 pm.

हिंदी






