{"id":201151,"date":"2024-07-25T17:29:18","date_gmt":"2024-07-25T11:59:18","guid":{"rendered":"https:\/\/newsmakhani.com\/?p=201151"},"modified":"2024-07-25T17:29:18","modified_gmt":"2024-07-25T11:59:18","slug":"deputy-commissioner-reviews-work-of-under-construction-steel-bridge-build-on-sirhind-canal","status":"publish","type":"post","link":"https:\/\/newsnarad.com\/hi\/deputy-commissioner-reviews-work-of-under-construction-steel-bridge-build-on-sirhind-canal\/","title":{"rendered":"Deputy Commissioner reviews work\u00a0 of under construction steel bridge build on Sirhind canal"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-hi\">\u0915\u094d\u0937\u092e\u093e \u0915\u0930\u0947\u0902, \u092f\u0939 \u0938\u092e\u093e\u091a\u093e\u0930 \u0906\u092a\u0915\u0947 \u0905\u0928\u0941\u0930\u094b\u0927 \u0915\u0940 \u092d\u093e\u0937\u093e \u092e\u0947\u0902 \u0909\u092a\u0932\u092c\u094d\u0927 \u0928\u0939\u0940\u0902 \u0939\u0948\u0964 <a href=\"https:\/\/newsmakhani.com\/en\/\">\u0915\u0943\u092a\u092f\u093e \u092f\u0939\u093e\u0901 \u0926\u0947\u0916\u0947\u0902\u0964<\/a><\/p><p><\/p>\n<div id=\":uj\" class=\"ii gt\">\n<div id=\":q1\" class=\"a3s aiL \">\n<div dir=\"auto\">\n<h5 dir=\"auto\">National Highways Department issues a notice to impose a penalty on the company due to delay in construction of the bridge<\/h5>\n<h5 dir=\"auto\">Rs 2.91 crore deducts so far from payment of\u00a0 M\/S S.P. Singla construction Pvt Ltd. : Executive Engineer<\/h5>\n<div dir=\"auto\"><\/div>\n<div dir=\"auto\"><strong>Rupnagar, July 25, 2024<\/strong><\/div>\n<div dir=\"auto\"><\/div>\n<div dir=\"auto\">Deputy Commissioner Dr. Preeti Yadav today reviewed the work of under construction steel bridge which is being built over the Sirhind Canal near Nehru Stadium at Ropar, where she ordered the completion of the work will be done at the earliest.<\/div>\n<div dir=\"auto\"><\/div>\n<div dir=\"auto\">On this occasion, the Deputy Commissioner instructed the officials of the department and the representatives of the company to complete this construction as soon as possible so that this bridge can be opened for the people.<\/div>\n<div dir=\"auto\"><\/div>\n<div dir=\"auto\">She said that the National Highways Department has issued a notice of imposition of penalty due to the delay in the construction of the steel bridge, regarding which the final decision will be taken by the Ministry of Road Transport and Highways. Although, Rs 2.91 crore deducted so far from payment made to M\/S S.P. Singla construction Pvt Ltd.<\/div>\n<div dir=\"auto\"><\/div>\n<div dir=\"auto\">Giving details about bridge, Executive Engineer National Highway Division, Rupnagar Sandeep Kumar informed that construction of the 135 meter long steel bridge will cost a total of Rs 52.77 crore which will be opened for traffic within three months.<\/div>\n<div dir=\"auto\"><\/div>\n<div dir=\"auto\">He further said that length of bridge is 135 meters while the total length of the project is 285 meters which will be 4-laned and 1.5 meters wide footpath is also being constructed on it.<\/div>\n<div dir=\"auto\"><\/div>\n<div dir=\"auto\">He said that the construction of this steel bridge is being monitored by the higher authorities of National Highways department, in view of which the department has recommended imposition of penalty against the construction company and payment has been deducted.<\/div>\n<\/div>\n<div class=\"yj6qo\"><\/div>\n<div class=\"adL\"><\/div>\n<\/div>\n<\/div>\n<div id=\":ol\" class=\"hq gt\"><\/div>\n<p><\/p>","protected":false},"excerpt":{"rendered":"<p>\u0915\u094d\u0937\u092e\u093e \u0915\u0930\u0947\u0902, \u092f\u0939 \u0938\u092e\u093e\u091a\u093e\u0930 \u0906\u092a\u0915\u0947 \u0905\u0928\u0941\u0930\u094b\u0927 \u0915\u0940 \u092d\u093e\u0937\u093e \u092e\u0947\u0902 \u0909\u092a\u0932\u092c\u094d\u0927 \u0928\u0939\u0940\u0902 \u0939\u0948\u0964 \u0915\u0943\u092a\u092f\u093e \u092f\u0939\u093e\u0901 \u0926\u0947\u0916\u0947\u0902\u0964 National Highways Department issues a notice to impose a penalty on the company due to delay in construction of the bridge Rs 2.91 crore deducts so far from payment of\u00a0 M\/S S.P. Singla construction Pvt Ltd. : Executive Engineer Rupnagar, [&hellip;]<\/p>\n","protected":false},"author":18,"featured_media":201152,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[2704],"tags":[2692,53624,56731,90296,21809,54190],"class_list":["post-201151","post","type-post","status-publish","format-standard","has-post-thumbnail","category-roop-nagar","tag-deputy-commissioner","tag-nehru-stadium","tag-news-makhani","tag-preeti-yadav","tag-ropar","tag-sirhind-canal"],"aioseo_notices":[],"_links":{"self":[{"href":"https:\/\/newsnarad.com\/hi\/wp-json\/wp\/v2\/posts\/201151","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/newsnarad.com\/hi\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/newsnarad.com\/hi\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/newsnarad.com\/hi\/wp-json\/wp\/v2\/users\/18"}],"replies":[{"embeddable":true,"href":"https:\/\/newsnarad.com\/hi\/wp-json\/wp\/v2\/comments?post=201151"}],"version-history":[{"count":0,"href":"https:\/\/newsnarad.com\/hi\/wp-json\/wp\/v2\/posts\/201151\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/newsnarad.com\/hi\/wp-json\/wp\/v2\/media\/201152"}],"wp:attachment":[{"href":"https:\/\/newsnarad.com\/hi\/wp-json\/wp\/v2\/media?parent=201151"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/newsnarad.com\/hi\/wp-json\/wp\/v2\/categories?post=201151"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/newsnarad.com\/hi\/wp-json\/wp\/v2\/tags?post=201151"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}