{"id":26622,"date":"2021-01-31T11:18:03","date_gmt":"2021-01-31T05:48:03","guid":{"rendered":"https:\/\/newsmakhani.com\/?p=26622"},"modified":"2021-01-31T11:19:58","modified_gmt":"2021-01-31T05:49:58","slug":"hydro-electric-project-in-nepal","status":"publish","type":"post","link":"https:\/\/newsnarad.com\/hi\/hydro-electric-project-in-nepal\/","title":{"rendered":"Hydro Electric Project in Nepal"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-hi\">\u0915\u094d\u0937\u092e\u093e \u0915\u0930\u0947\u0902, \u092f\u0939 \u0938\u092e\u093e\u091a\u093e\u0930 \u0906\u092a\u0915\u0947 \u0905\u0928\u0941\u0930\u094b\u0927 \u0915\u0940 \u092d\u093e\u0937\u093e \u092e\u0947\u0902 \u0909\u092a\u0932\u092c\u094d\u0927 \u0928\u0939\u0940\u0902 \u0939\u0948\u0964 <a href=\"https:\/\/newsmakhani.com\/en\/\">\u0915\u0943\u092a\u092f\u093e \u092f\u0939\u093e\u0901 \u0926\u0947\u0916\u0947\u0902\u0964<\/a><\/p><p><\/p>\n<h2>SJVN Bags 679 MW Lower Arun Hydro Electric Project in Nepal<\/h2>\n<h5>3<strong>0 january<\/strong><\/h5>\n<h5>Sh. Nand Lal Sharma, Chairman &amp; Managing Director SJVN informed that Government of Nepal has allotted 679 MW Lower Arun Hydro Electric Project in Nepal to SJVN through competitive bidding. The Investment Board of Nepal in its meeting on 29.01.2021, chaired by Hon\u2019ble Prime Minister of Nepal, Sh. K.P. Sharma Oli has awarded the Project to SJVN<\/h5>\n<p>Sh. Nand Lal Sharma, Chairman &amp; Managing Director, SJVN met the Hon\u2019ble Prime Minister of Nepal, Sh. K.P. Sharma Oli, in Kathmandu. Sh. Nand Lal Sharma expressed his deepest gratitude to the Hon\u2019ble Prime Minister for awarding the Lower Arun Hydro Electric Project to SJVN and assured the Prime Minister that project will be completed in a time bound manner.<\/p>\n<p>The Lower Arun Hydro Electric Project is located in Sankhuwasabha and Bhojpur Districts of Nepal. On completion 679 MW Lower Arun Hydro Electric Project will generate 3561 million units of electricity per annum.Sh. Sharma further stated that the Projects being developed by SJVN in Nepal would result in overall development and boost mutual economic growth in India &amp; Nepal. He said that the Infrastructural Development related to project activities would ensure overall socio-economic development of the\u00a0 region. SJVN is already constructing 900 MW Arun 3 HEP in Nepal and 217km 400 kV associated transmission system. With addition of Lower Arun Hydro Electric Project to its kitty, SJVN portfolio now stands at 8960.5 MW.<\/p>\n<p>SJVN\u2019s present installed capacity is 2016.51 MW and aims to be 5000 MW company by 2023, 12000 MW Company by 2030 and 25000 MW Company by 2040. SJVN has presence in various sectors of energy generation which includes Hydro, Wind, Solar &amp; Thermal. The company also has presence in the field of Energy Transmission.<\/p>","protected":false},"excerpt":{"rendered":"<p>\u0915\u094d\u0937\u092e\u093e \u0915\u0930\u0947\u0902, \u092f\u0939 \u0938\u092e\u093e\u091a\u093e\u0930 \u0906\u092a\u0915\u0947 \u0905\u0928\u0941\u0930\u094b\u0927 \u0915\u0940 \u092d\u093e\u0937\u093e \u092e\u0947\u0902 \u0909\u092a\u0932\u092c\u094d\u0927 \u0928\u0939\u0940\u0902 \u0939\u0948\u0964 \u0915\u0943\u092a\u092f\u093e \u092f\u0939\u093e\u0901 \u0926\u0947\u0916\u0947\u0902\u0964 SJVN Bags 679 MW Lower Arun Hydro Electric Project in Nepal 30 january Sh. Nand Lal Sharma, Chairman &amp; Managing Director SJVN informed that Government of Nepal has allotted 679 MW Lower Arun Hydro Electric Project in Nepal to SJVN [&hellip;]<\/p>\n","protected":false},"author":6,"featured_media":26623,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[192,109,122,4,7,197],"tags":[14560,14562,14561,14563],"class_list":["post-26622","post","type-post","status-publish","format-standard","has-post-thumbnail","category-education","category-national","category-news","category-politics","category-technology","category-water","tag-hydroelectric","tag-nepal","tag-power","tag-technology"],"aioseo_notices":[],"aioseo_head":"\n\t\t<!-- All in One SEO 4.9.10 - aioseo.com -->\n\t<meta name=\"description\" content=\"\u0915\u094d\u0937\u092e\u093e \u0915\u0930\u0947\u0902, \u092f\u0939 \u0938\u092e\u093e\u091a\u093e\u0930 \u0906\u092a\u0915\u0947 \u0905\u0928\u0941\u0930\u094b\u0927 \u0915\u0940 \u092d\u093e\u0937\u093e \u092e\u0947\u0902 \u0909\u092a\u0932\u092c\u094d\u0927 \u0928\u0939\u0940\u0902 \u0939\u0948\u0964 \u0915\u0943\u092a\u092f\u093e \u092f\u0939\u093e\u0901 \u0926\u0947\u0916\u0947\u0902\u0964SJVN Bags 679 MW Lower Arun Hydro Electric Project in Nepal 30 january Sh. Nand Lal Sharma, Chairman &amp; Managing Director SJVN informed that Government of Nepal has allotted 679 MW Lower Arun Hydro Electric Project in Nepal to SJVN through\" \/>\n\t<meta name=\"robots\" content=\"max-image-preview:large\" \/>\n\t<meta name=\"author\" content=\"Tamanna Thakur\"\/>\n\t<link rel=\"canonical\" href=\"https:\/\/newsnarad.com\/hi\/hydro-electric-project-in-nepal\/\" \/>\n\t<meta name=\"generator\" content=\"All in One SEO (AIOSEO) 4.9.10\" \/>\n\t\t<meta property=\"og:locale\" content=\"hi_IN\" \/>\n\t\t<meta property=\"og:site_name\" content=\"\u0928\u094d\u092f\u0942\u091c\u093c \u0928\u093e\u0930\u0926  | \u0909\u0924\u094d\u0924\u0930 \u092d\u093e\u0930\u0924 \u0915\u0940 \u0924\u093e\u091c\u093c\u093e \u0914\u0930 \u0924\u093e\u091c\u093c\u093e \u0916\u093c\u092c\u0930\u0947\u0902 - \u0928\u094d\u092f\u0942\u091c\u093c \u0928\u093e\u0930\u0926 | \u0909\u0924\u094d\u0924\u0930 \u092d\u093e\u0930\u0924 \u0915\u0940 \u0928\u0935\u0940\u0928\u0924\u092e \u0914\u0930 \u092c\u094d\u0930\u0947\u0915\u093f\u0902\u0917 \u0928\u094d\u092f\u0942\u091c\u093c \u091c\u093f\u0928\u092e\u0947\u0902 \u092a\u0902\u091c\u093e\u092c, \u0939\u0930\u093f\u092f\u093e\u0923\u093e, \u0939\u093f\u092e\u093e\u091a\u0932 \u092a\u094d\u0930\u0926\u0947\u0936, \u092f\u0942\u092a\u0940, \u092c\u093f\u0939\u093e\u0930, J &amp; K \u0930\u093e\u091c\u0938\u094d\u0925\u093e\u0928, \u0909\u0924\u094d\u0924\u0930\u093e\u0916\u0902\u0921, \u091a\u0902\u0921\u0940\u0917\u0922\u093c, \u0926\u093f\u0932\u094d\u0932\u0940 NCR \u0906\u0926\u093f \u0936\u093e\u092e\u093f\u0932 \u0939\u0948\u0902\u0964\" \/>\n\t\t<meta property=\"og:type\" content=\"article\" \/>\n\t\t<meta property=\"og:title\" content=\"Hydro Electric Project in Nepal - \u0928\u094d\u092f\u0942\u091c\u093c \u0928\u093e\u0930\u0926 | \u0909\u0924\u094d\u0924\u0930 \u092d\u093e\u0930\u0924 \u0915\u0940 \u0924\u093e\u091c\u093c\u093e \u0914\u0930 \u0924\u093e\u091c\u093c\u093e \u0916\u093c\u092c\u0930\u0947\u0902\" \/>\n\t\t<meta property=\"og:description\" content=\"\u0915\u094d\u0937\u092e\u093e \u0915\u0930\u0947\u0902, \u092f\u0939 \u0938\u092e\u093e\u091a\u093e\u0930 \u0906\u092a\u0915\u0947 \u0905\u0928\u0941\u0930\u094b\u0927 \u0915\u0940 \u092d\u093e\u0937\u093e \u092e\u0947\u0902 \u0909\u092a\u0932\u092c\u094d\u0927 \u0928\u0939\u0940\u0902 \u0939\u0948\u0964 \u0915\u0943\u092a\u092f\u093e \u092f\u0939\u093e\u0901 \u0926\u0947\u0916\u0947\u0902\u0964SJVN Bags 679 MW Lower Arun Hydro Electric Project in Nepal 30 january Sh. Nand Lal Sharma, Chairman &amp; Managing Director SJVN informed that Government of Nepal has allotted 679 MW Lower Arun Hydro Electric Project in Nepal to SJVN through\" \/>\n\t\t<meta property=\"og:url\" content=\"https:\/\/newsnarad.com\/hi\/hydro-electric-project-in-nepal\/\" \/>\n\t\t<meta property=\"article:published_time\" content=\"2021-01-31T05:48:03+00:00\" \/>\n\t\t<meta property=\"article:modified_time\" content=\"2021-01-31T05:49:58+00:00\" \/>\n\t\t<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n\t\t<meta name=\"twitter:title\" content=\"Hydro Electric Project in Nepal - \u0928\u094d\u092f\u0942\u091c\u093c \u0928\u093e\u0930\u0926 | \u0909\u0924\u094d\u0924\u0930 \u092d\u093e\u0930\u0924 \u0915\u0940 \u0924\u093e\u091c\u093c\u093e \u0914\u0930 \u0924\u093e\u091c\u093c\u093e \u0916\u093c\u092c\u0930\u0947\u0902\" \/>\n\t\t<meta name=\"twitter:description\" content=\"\u0915\u094d\u0937\u092e\u093e \u0915\u0930\u0947\u0902, \u092f\u0939 \u0938\u092e\u093e\u091a\u093e\u0930 \u0906\u092a\u0915\u0947 \u0905\u0928\u0941\u0930\u094b\u0927 \u0915\u0940 \u092d\u093e\u0937\u093e \u092e\u0947\u0902 \u0909\u092a\u0932\u092c\u094d\u0927 \u0928\u0939\u0940\u0902 \u0939\u0948\u0964 \u0915\u0943\u092a\u092f\u093e \u092f\u0939\u093e\u0901 \u0926\u0947\u0916\u0947\u0902\u0964SJVN Bags 679 MW Lower Arun Hydro Electric Project in Nepal 30 january Sh. Nand Lal Sharma, Chairman &amp; Managing Director SJVN informed that Government of Nepal has allotted 679 MW Lower Arun Hydro Electric Project in Nepal to SJVN through\" \/>\n\t\t<script type=\"application\/ld+json\" class=\"aioseo-schema\">\n\t\t\t{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"BlogPosting\",\"@id\":\"https:\\\/\\\/newsnarad.com\\\/hi\\\/hydro-electric-project-in-nepal\\\/#blogposting\",\"name\":\"Hydro Electric Project in Nepal - \\u0928\\u094d\\u092f\\u0942\\u091c\\u093c \\u0928\\u093e\\u0930\\u0926 | \\u0909\\u0924\\u094d\\u0924\\u0930 \\u092d\\u093e\\u0930\\u0924 \\u0915\\u0940 \\u0924\\u093e\\u091c\\u093c\\u093e \\u0914\\u0930 \\u0924\\u093e\\u091c\\u093c\\u093e \\u0916\\u093c\\u092c\\u0930\\u0947\\u0902\",\"headline\":\"Hydro Electric Project in Nepal\",\"author\":{\"@id\":\"https:\\\/\\\/newsnarad.com\\\/hi\\\/author\\\/tamanna\\\/#author\"},\"publisher\":{\"@id\":\"https:\\\/\\\/newsnarad.com\\\/hi\\\/#organization\"},\"image\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/newsnarad.com\\\/wp-content\\\/uploads\\\/2021\\\/01\\\/Rb3ca34c6b1ed04f92a477ff6ecdf841a.jpg\",\"width\":800,\"height\":450},\"datePublished\":\"2021-01-31T11:18:03+05:30\",\"dateModified\":\"2021-01-31T11:19:58+05:30\",\"inLanguage\":\"hi-IN\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/newsnarad.com\\\/hi\\\/hydro-electric-project-in-nepal\\\/#webpage\"},\"isPartOf\":{\"@id\":\"https:\\\/\\\/newsnarad.com\\\/hi\\\/hydro-electric-project-in-nepal\\\/#webpage\"},\"articleSection\":\"\\u0936\\u093f\\u0915\\u094d\\u0937\\u093e, \\u0930\\u093e\\u0937\\u094d\\u091f\\u094d\\u0930\\u0940\\u092f, \\u0938\\u092e\\u093e\\u091a\\u093e\\u0930, \\u0930\\u093e\\u091c\\u0928\\u0940\\u0924\\u093f, \\u092a\\u094d\\u0930\\u094c\\u0926\\u094d\\u092f\\u094b\\u0917\\u093f\\u0915\\u0940, \\u092a\\u093e\\u0928\\u0940, hydroelectric, nepal, power, technology\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/newsnarad.com\\\/hi\\\/hydro-electric-project-in-nepal\\\/#breadcrumblist\",\"itemListElement\":[{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/newsnarad.com\\\/hi#listItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/newsnarad.com\\\/hi\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/newsnarad.com\\\/hi\\\/category\\\/politics\\\/#listItem\",\"name\":\"\\u0930\\u093e\\u091c\\u0928\\u0940\\u0924\\u093f\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/newsnarad.com\\\/hi\\\/category\\\/politics\\\/#listItem\",\"position\":2,\"name\":\"\\u0930\\u093e\\u091c\\u0928\\u0940\\u0924\\u093f\",\"item\":\"https:\\\/\\\/newsnarad.com\\\/hi\\\/category\\\/politics\\\/\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/newsnarad.com\\\/hi\\\/hydro-electric-project-in-nepal\\\/#listItem\",\"name\":\"Hydro Electric Project in Nepal\"},\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/newsnarad.com\\\/hi#listItem\",\"name\":\"Home\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/newsnarad.com\\\/hi\\\/hydro-electric-project-in-nepal\\\/#listItem\",\"position\":3,\"name\":\"Hydro Electric Project in Nepal\",\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/newsnarad.com\\\/hi\\\/category\\\/politics\\\/#listItem\",\"name\":\"\\u0930\\u093e\\u091c\\u0928\\u0940\\u0924\\u093f\"}}]},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/newsnarad.com\\\/hi\\\/#organization\",\"name\":\"\\u0928\\u094d\\u092f\\u0942\\u091c\\u093c \\u0928\\u093e\\u0930\\u0926  | \\u0909\\u0924\\u094d\\u0924\\u0930 \\u092d\\u093e\\u0930\\u0924 \\u0915\\u0940 \\u0924\\u093e\\u091c\\u093c\\u093e \\u0914\\u0930 \\u0924\\u093e\\u091c\\u093c\\u093e \\u0916\\u093c\\u092c\\u0930\\u0947\\u0902\",\"description\":\"\\u0928\\u094d\\u092f\\u0942\\u091c\\u093c \\u0928\\u093e\\u0930\\u0926 | \\u0909\\u0924\\u094d\\u0924\\u0930 \\u092d\\u093e\\u0930\\u0924 \\u0915\\u0940 \\u0928\\u0935\\u0940\\u0928\\u0924\\u092e \\u0914\\u0930 \\u092c\\u094d\\u0930\\u0947\\u0915\\u093f\\u0902\\u0917 \\u0928\\u094d\\u092f\\u0942\\u091c\\u093c \\u091c\\u093f\\u0928\\u092e\\u0947\\u0902 \\u092a\\u0902\\u091c\\u093e\\u092c, \\u0939\\u0930\\u093f\\u092f\\u093e\\u0923\\u093e, \\u0939\\u093f\\u092e\\u093e\\u091a\\u0932 \\u092a\\u094d\\u0930\\u0926\\u0947\\u0936, \\u092f\\u0942\\u092a\\u0940, \\u092c\\u093f\\u0939\\u093e\\u0930, J & K \\u0930\\u093e\\u091c\\u0938\\u094d\\u0925\\u093e\\u0928, \\u0909\\u0924\\u094d\\u0924\\u0930\\u093e\\u0916\\u0902\\u0921, \\u091a\\u0902\\u0921\\u0940\\u0917\\u0922\\u093c, \\u0926\\u093f\\u0932\\u094d\\u0932\\u0940 NCR \\u0906\\u0926\\u093f \\u0936\\u093e\\u092e\\u093f\\u0932 \\u0939\\u0948\\u0902\\u0964\",\"url\":\"https:\\\/\\\/newsnarad.com\\\/hi\\\/\"},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/newsnarad.com\\\/hi\\\/author\\\/tamanna\\\/#author\",\"url\":\"https:\\\/\\\/newsnarad.com\\\/hi\\\/author\\\/tamanna\\\/\",\"name\":\"Tamanna Thakur\",\"image\":{\"@type\":\"ImageObject\",\"@id\":\"https:\\\/\\\/newsnarad.com\\\/hi\\\/hydro-electric-project-in-nepal\\\/#authorImage\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/b52180d4521d081c1216146d42a97816b77ceb246f3f2b9774da5cea27c33542?s=96&d=mm&r=g\",\"width\":96,\"height\":96,\"caption\":\"Tamanna Thakur\"}},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/newsnarad.com\\\/hi\\\/hydro-electric-project-in-nepal\\\/#webpage\",\"url\":\"https:\\\/\\\/newsnarad.com\\\/hi\\\/hydro-electric-project-in-nepal\\\/\",\"name\":\"Hydro Electric Project in Nepal - \\u0928\\u094d\\u092f\\u0942\\u091c\\u093c \\u0928\\u093e\\u0930\\u0926 | \\u0909\\u0924\\u094d\\u0924\\u0930 \\u092d\\u093e\\u0930\\u0924 \\u0915\\u0940 \\u0924\\u093e\\u091c\\u093c\\u093e \\u0914\\u0930 \\u0924\\u093e\\u091c\\u093c\\u093e \\u0916\\u093c\\u092c\\u0930\\u0947\\u0902\",\"description\":\"\\u0915\\u094d\\u0937\\u092e\\u093e \\u0915\\u0930\\u0947\\u0902, \\u092f\\u0939 \\u0938\\u092e\\u093e\\u091a\\u093e\\u0930 \\u0906\\u092a\\u0915\\u0947 \\u0905\\u0928\\u0941\\u0930\\u094b\\u0927 \\u0915\\u0940 \\u092d\\u093e\\u0937\\u093e \\u092e\\u0947\\u0902 \\u0909\\u092a\\u0932\\u092c\\u094d\\u0927 \\u0928\\u0939\\u0940\\u0902 \\u0939\\u0948\\u0964 \\u0915\\u0943\\u092a\\u092f\\u093e \\u092f\\u0939\\u093e\\u0901 \\u0926\\u0947\\u0916\\u0947\\u0902\\u0964SJVN Bags 679 MW Lower Arun Hydro Electric Project in Nepal 30 january Sh. Nand Lal Sharma, Chairman & Managing Director SJVN informed that Government of Nepal has allotted 679 MW Lower Arun Hydro Electric Project in Nepal to SJVN through\",\"inLanguage\":\"hi-IN\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/newsnarad.com\\\/hi\\\/#website\"},\"breadcrumb\":{\"@id\":\"https:\\\/\\\/newsnarad.com\\\/hi\\\/hydro-electric-project-in-nepal\\\/#breadcrumblist\"},\"author\":{\"@id\":\"https:\\\/\\\/newsnarad.com\\\/hi\\\/author\\\/tamanna\\\/#author\"},\"creator\":{\"@id\":\"https:\\\/\\\/newsnarad.com\\\/hi\\\/author\\\/tamanna\\\/#author\"},\"image\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/newsnarad.com\\\/wp-content\\\/uploads\\\/2021\\\/01\\\/Rb3ca34c6b1ed04f92a477ff6ecdf841a.jpg\",\"@id\":\"https:\\\/\\\/newsnarad.com\\\/hi\\\/hydro-electric-project-in-nepal\\\/#mainImage\",\"width\":800,\"height\":450},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/newsnarad.com\\\/hi\\\/hydro-electric-project-in-nepal\\\/#mainImage\"},\"datePublished\":\"2021-01-31T11:18:03+05:30\",\"dateModified\":\"2021-01-31T11:19:58+05:30\"},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/newsnarad.com\\\/hi\\\/#website\",\"url\":\"https:\\\/\\\/newsnarad.com\\\/hi\\\/\",\"name\":\"\\u0928\\u094d\\u092f\\u0942\\u091c\\u093c \\u0928\\u093e\\u0930\\u0926  | \\u0909\\u0924\\u094d\\u0924\\u0930 \\u092d\\u093e\\u0930\\u0924 \\u0915\\u0940 \\u0924\\u093e\\u091c\\u093c\\u093e \\u0914\\u0930 \\u0924\\u093e\\u091c\\u093c\\u093e \\u0916\\u093c\\u092c\\u0930\\u0947\\u0902\",\"description\":\"\\u0928\\u094d\\u092f\\u0942\\u091c\\u093c \\u0928\\u093e\\u0930\\u0926 | \\u0909\\u0924\\u094d\\u0924\\u0930 \\u092d\\u093e\\u0930\\u0924 \\u0915\\u0940 \\u0928\\u0935\\u0940\\u0928\\u0924\\u092e \\u0914\\u0930 \\u092c\\u094d\\u0930\\u0947\\u0915\\u093f\\u0902\\u0917 \\u0928\\u094d\\u092f\\u0942\\u091c\\u093c \\u091c\\u093f\\u0928\\u092e\\u0947\\u0902 \\u092a\\u0902\\u091c\\u093e\\u092c, \\u0939\\u0930\\u093f\\u092f\\u093e\\u0923\\u093e, \\u0939\\u093f\\u092e\\u093e\\u091a\\u0932 \\u092a\\u094d\\u0930\\u0926\\u0947\\u0936, \\u092f\\u0942\\u092a\\u0940, \\u092c\\u093f\\u0939\\u093e\\u0930, J & K \\u0930\\u093e\\u091c\\u0938\\u094d\\u0925\\u093e\\u0928, \\u0909\\u0924\\u094d\\u0924\\u0930\\u093e\\u0916\\u0902\\u0921, \\u091a\\u0902\\u0921\\u0940\\u0917\\u0922\\u093c, \\u0926\\u093f\\u0932\\u094d\\u0932\\u0940 NCR \\u0906\\u0926\\u093f \\u0936\\u093e\\u092e\\u093f\\u0932 \\u0939\\u0948\\u0902\\u0964\",\"inLanguage\":\"hi-IN\",\"publisher\":{\"@id\":\"https:\\\/\\\/newsnarad.com\\\/hi\\\/#organization\"}}]}\n\t\t<\/script>\n\t\t<!-- All in One SEO -->\n\n","aioseo_head_json":{"title":"Hydro Electric Project in Nepal - \u0928\u094d\u092f\u0942\u091c\u093c \u0928\u093e\u0930\u0926 | \u0909\u0924\u094d\u0924\u0930 \u092d\u093e\u0930\u0924 \u0915\u0940 \u0924\u093e\u091c\u093c\u093e \u0914\u0930 \u0924\u093e\u091c\u093c\u093e \u0916\u093c\u092c\u0930\u0947\u0902","description":"\u0915\u094d\u0937\u092e\u093e \u0915\u0930\u0947\u0902, \u092f\u0939 \u0938\u092e\u093e\u091a\u093e\u0930 \u0906\u092a\u0915\u0947 \u0905\u0928\u0941\u0930\u094b\u0927 \u0915\u0940 \u092d\u093e\u0937\u093e \u092e\u0947\u0902 \u0909\u092a\u0932\u092c\u094d\u0927 \u0928\u0939\u0940\u0902 \u0939\u0948\u0964 \u0915\u0943\u092a\u092f\u093e \u092f\u0939\u093e\u0901 \u0926\u0947\u0916\u0947\u0902\u0964SJVN Bags 679 MW Lower Arun Hydro Electric Project in Nepal 30 january Sh. Nand Lal Sharma, Chairman & Managing Director SJVN informed that Government of Nepal has allotted 679 MW Lower Arun Hydro Electric Project in Nepal to SJVN through","canonical_url":"https:\/\/newsnarad.com\/hi\/hydro-electric-project-in-nepal\/","robots":"max-image-preview:large","keywords":"","webmasterTools":{"miscellaneous":""},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"BlogPosting","@id":"https:\/\/newsnarad.com\/hi\/hydro-electric-project-in-nepal\/#blogposting","name":"Hydro Electric Project in Nepal - \u0928\u094d\u092f\u0942\u091c\u093c \u0928\u093e\u0930\u0926 | \u0909\u0924\u094d\u0924\u0930 \u092d\u093e\u0930\u0924 \u0915\u0940 \u0924\u093e\u091c\u093c\u093e \u0914\u0930 \u0924\u093e\u091c\u093c\u093e \u0916\u093c\u092c\u0930\u0947\u0902","headline":"Hydro Electric Project in Nepal","author":{"@id":"https:\/\/newsnarad.com\/hi\/author\/tamanna\/#author"},"publisher":{"@id":"https:\/\/newsnarad.com\/hi\/#organization"},"image":{"@type":"ImageObject","url":"https:\/\/newsnarad.com\/wp-content\/uploads\/2021\/01\/Rb3ca34c6b1ed04f92a477ff6ecdf841a.jpg","width":800,"height":450},"datePublished":"2021-01-31T11:18:03+05:30","dateModified":"2021-01-31T11:19:58+05:30","inLanguage":"hi-IN","mainEntityOfPage":{"@id":"https:\/\/newsnarad.com\/hi\/hydro-electric-project-in-nepal\/#webpage"},"isPartOf":{"@id":"https:\/\/newsnarad.com\/hi\/hydro-electric-project-in-nepal\/#webpage"},"articleSection":"\u0936\u093f\u0915\u094d\u0937\u093e, \u0930\u093e\u0937\u094d\u091f\u094d\u0930\u0940\u092f, \u0938\u092e\u093e\u091a\u093e\u0930, \u0930\u093e\u091c\u0928\u0940\u0924\u093f, \u092a\u094d\u0930\u094c\u0926\u094d\u092f\u094b\u0917\u093f\u0915\u0940, \u092a\u093e\u0928\u0940, hydroelectric, nepal, power, technology"},{"@type":"BreadcrumbList","@id":"https:\/\/newsnarad.com\/hi\/hydro-electric-project-in-nepal\/#breadcrumblist","itemListElement":[{"@type":"ListItem","@id":"https:\/\/newsnarad.com\/hi#listItem","position":1,"name":"Home","item":"https:\/\/newsnarad.com\/hi","nextItem":{"@type":"ListItem","@id":"https:\/\/newsnarad.com\/hi\/category\/politics\/#listItem","name":"\u0930\u093e\u091c\u0928\u0940\u0924\u093f"}},{"@type":"ListItem","@id":"https:\/\/newsnarad.com\/hi\/category\/politics\/#listItem","position":2,"name":"\u0930\u093e\u091c\u0928\u0940\u0924\u093f","item":"https:\/\/newsnarad.com\/hi\/category\/politics\/","nextItem":{"@type":"ListItem","@id":"https:\/\/newsnarad.com\/hi\/hydro-electric-project-in-nepal\/#listItem","name":"Hydro Electric Project in Nepal"},"previousItem":{"@type":"ListItem","@id":"https:\/\/newsnarad.com\/hi#listItem","name":"Home"}},{"@type":"ListItem","@id":"https:\/\/newsnarad.com\/hi\/hydro-electric-project-in-nepal\/#listItem","position":3,"name":"Hydro Electric Project in Nepal","previousItem":{"@type":"ListItem","@id":"https:\/\/newsnarad.com\/hi\/category\/politics\/#listItem","name":"\u0930\u093e\u091c\u0928\u0940\u0924\u093f"}}]},{"@type":"Organization","@id":"https:\/\/newsnarad.com\/hi\/#organization","name":"\u0928\u094d\u092f\u0942\u091c\u093c \u0928\u093e\u0930\u0926  | \u0909\u0924\u094d\u0924\u0930 \u092d\u093e\u0930\u0924 \u0915\u0940 \u0924\u093e\u091c\u093c\u093e \u0914\u0930 \u0924\u093e\u091c\u093c\u093e \u0916\u093c\u092c\u0930\u0947\u0902","description":"\u0928\u094d\u092f\u0942\u091c\u093c \u0928\u093e\u0930\u0926 | \u0909\u0924\u094d\u0924\u0930 \u092d\u093e\u0930\u0924 \u0915\u0940 \u0928\u0935\u0940\u0928\u0924\u092e \u0914\u0930 \u092c\u094d\u0930\u0947\u0915\u093f\u0902\u0917 \u0928\u094d\u092f\u0942\u091c\u093c \u091c\u093f\u0928\u092e\u0947\u0902 \u092a\u0902\u091c\u093e\u092c, \u0939\u0930\u093f\u092f\u093e\u0923\u093e, \u0939\u093f\u092e\u093e\u091a\u0932 \u092a\u094d\u0930\u0926\u0947\u0936, \u092f\u0942\u092a\u0940, \u092c\u093f\u0939\u093e\u0930, J & K \u0930\u093e\u091c\u0938\u094d\u0925\u093e\u0928, \u0909\u0924\u094d\u0924\u0930\u093e\u0916\u0902\u0921, \u091a\u0902\u0921\u0940\u0917\u0922\u093c, \u0926\u093f\u0932\u094d\u0932\u0940 NCR \u0906\u0926\u093f \u0936\u093e\u092e\u093f\u0932 \u0939\u0948\u0902\u0964","url":"https:\/\/newsnarad.com\/hi\/"},{"@type":"Person","@id":"https:\/\/newsnarad.com\/hi\/author\/tamanna\/#author","url":"https:\/\/newsnarad.com\/hi\/author\/tamanna\/","name":"Tamanna Thakur","image":{"@type":"ImageObject","@id":"https:\/\/newsnarad.com\/hi\/hydro-electric-project-in-nepal\/#authorImage","url":"https:\/\/secure.gravatar.com\/avatar\/b52180d4521d081c1216146d42a97816b77ceb246f3f2b9774da5cea27c33542?s=96&d=mm&r=g","width":96,"height":96,"caption":"Tamanna Thakur"}},{"@type":"WebPage","@id":"https:\/\/newsnarad.com\/hi\/hydro-electric-project-in-nepal\/#webpage","url":"https:\/\/newsnarad.com\/hi\/hydro-electric-project-in-nepal\/","name":"Hydro Electric Project in Nepal - \u0928\u094d\u092f\u0942\u091c\u093c \u0928\u093e\u0930\u0926 | \u0909\u0924\u094d\u0924\u0930 \u092d\u093e\u0930\u0924 \u0915\u0940 \u0924\u093e\u091c\u093c\u093e \u0914\u0930 \u0924\u093e\u091c\u093c\u093e \u0916\u093c\u092c\u0930\u0947\u0902","description":"\u0915\u094d\u0937\u092e\u093e \u0915\u0930\u0947\u0902, \u092f\u0939 \u0938\u092e\u093e\u091a\u093e\u0930 \u0906\u092a\u0915\u0947 \u0905\u0928\u0941\u0930\u094b\u0927 \u0915\u0940 \u092d\u093e\u0937\u093e \u092e\u0947\u0902 \u0909\u092a\u0932\u092c\u094d\u0927 \u0928\u0939\u0940\u0902 \u0939\u0948\u0964 \u0915\u0943\u092a\u092f\u093e \u092f\u0939\u093e\u0901 \u0926\u0947\u0916\u0947\u0902\u0964SJVN Bags 679 MW Lower Arun Hydro Electric Project in Nepal 30 january Sh. Nand Lal Sharma, Chairman & Managing Director SJVN informed that Government of Nepal has allotted 679 MW Lower Arun Hydro Electric Project in Nepal to SJVN through","inLanguage":"hi-IN","isPartOf":{"@id":"https:\/\/newsnarad.com\/hi\/#website"},"breadcrumb":{"@id":"https:\/\/newsnarad.com\/hi\/hydro-electric-project-in-nepal\/#breadcrumblist"},"author":{"@id":"https:\/\/newsnarad.com\/hi\/author\/tamanna\/#author"},"creator":{"@id":"https:\/\/newsnarad.com\/hi\/author\/tamanna\/#author"},"image":{"@type":"ImageObject","url":"https:\/\/newsnarad.com\/wp-content\/uploads\/2021\/01\/Rb3ca34c6b1ed04f92a477ff6ecdf841a.jpg","@id":"https:\/\/newsnarad.com\/hi\/hydro-electric-project-in-nepal\/#mainImage","width":800,"height":450},"primaryImageOfPage":{"@id":"https:\/\/newsnarad.com\/hi\/hydro-electric-project-in-nepal\/#mainImage"},"datePublished":"2021-01-31T11:18:03+05:30","dateModified":"2021-01-31T11:19:58+05:30"},{"@type":"WebSite","@id":"https:\/\/newsnarad.com\/hi\/#website","url":"https:\/\/newsnarad.com\/hi\/","name":"\u0928\u094d\u092f\u0942\u091c\u093c \u0928\u093e\u0930\u0926  | \u0909\u0924\u094d\u0924\u0930 \u092d\u093e\u0930\u0924 \u0915\u0940 \u0924\u093e\u091c\u093c\u093e \u0914\u0930 \u0924\u093e\u091c\u093c\u093e \u0916\u093c\u092c\u0930\u0947\u0902","description":"\u0928\u094d\u092f\u0942\u091c\u093c \u0928\u093e\u0930\u0926 | \u0909\u0924\u094d\u0924\u0930 \u092d\u093e\u0930\u0924 \u0915\u0940 \u0928\u0935\u0940\u0928\u0924\u092e \u0914\u0930 \u092c\u094d\u0930\u0947\u0915\u093f\u0902\u0917 \u0928\u094d\u092f\u0942\u091c\u093c \u091c\u093f\u0928\u092e\u0947\u0902 \u092a\u0902\u091c\u093e\u092c, \u0939\u0930\u093f\u092f\u093e\u0923\u093e, \u0939\u093f\u092e\u093e\u091a\u0932 \u092a\u094d\u0930\u0926\u0947\u0936, \u092f\u0942\u092a\u0940, \u092c\u093f\u0939\u093e\u0930, J & K \u0930\u093e\u091c\u0938\u094d\u0925\u093e\u0928, \u0909\u0924\u094d\u0924\u0930\u093e\u0916\u0902\u0921, \u091a\u0902\u0921\u0940\u0917\u0922\u093c, \u0926\u093f\u0932\u094d\u0932\u0940 NCR \u0906\u0926\u093f \u0936\u093e\u092e\u093f\u0932 \u0939\u0948\u0902\u0964","inLanguage":"hi-IN","publisher":{"@id":"https:\/\/newsnarad.com\/hi\/#organization"}}]},"og:locale":"hi_IN","og:site_name":"\u0928\u094d\u092f\u0942\u091c\u093c \u0928\u093e\u0930\u0926  | \u0909\u0924\u094d\u0924\u0930 \u092d\u093e\u0930\u0924 \u0915\u0940 \u0924\u093e\u091c\u093c\u093e \u0914\u0930 \u0924\u093e\u091c\u093c\u093e \u0916\u093c\u092c\u0930\u0947\u0902 - \u0928\u094d\u092f\u0942\u091c\u093c \u0928\u093e\u0930\u0926 | \u0909\u0924\u094d\u0924\u0930 \u092d\u093e\u0930\u0924 \u0915\u0940 \u0928\u0935\u0940\u0928\u0924\u092e \u0914\u0930 \u092c\u094d\u0930\u0947\u0915\u093f\u0902\u0917 \u0928\u094d\u092f\u0942\u091c\u093c \u091c\u093f\u0928\u092e\u0947\u0902 \u092a\u0902\u091c\u093e\u092c, \u0939\u0930\u093f\u092f\u093e\u0923\u093e, \u0939\u093f\u092e\u093e\u091a\u0932 \u092a\u094d\u0930\u0926\u0947\u0936, \u092f\u0942\u092a\u0940, \u092c\u093f\u0939\u093e\u0930, J &amp; K \u0930\u093e\u091c\u0938\u094d\u0925\u093e\u0928, \u0909\u0924\u094d\u0924\u0930\u093e\u0916\u0902\u0921, \u091a\u0902\u0921\u0940\u0917\u0922\u093c, \u0926\u093f\u0932\u094d\u0932\u0940 NCR \u0906\u0926\u093f \u0936\u093e\u092e\u093f\u0932 \u0939\u0948\u0902\u0964","og:type":"article","og:title":"Hydro Electric Project in Nepal - \u0928\u094d\u092f\u0942\u091c\u093c \u0928\u093e\u0930\u0926 | \u0909\u0924\u094d\u0924\u0930 \u092d\u093e\u0930\u0924 \u0915\u0940 \u0924\u093e\u091c\u093c\u093e \u0914\u0930 \u0924\u093e\u091c\u093c\u093e \u0916\u093c\u092c\u0930\u0947\u0902","og:description":"\u0915\u094d\u0937\u092e\u093e \u0915\u0930\u0947\u0902, \u092f\u0939 \u0938\u092e\u093e\u091a\u093e\u0930 \u0906\u092a\u0915\u0947 \u0905\u0928\u0941\u0930\u094b\u0927 \u0915\u0940 \u092d\u093e\u0937\u093e \u092e\u0947\u0902 \u0909\u092a\u0932\u092c\u094d\u0927 \u0928\u0939\u0940\u0902 \u0939\u0948\u0964 \u0915\u0943\u092a\u092f\u093e \u092f\u0939\u093e\u0901 \u0926\u0947\u0916\u0947\u0902\u0964SJVN Bags 679 MW Lower Arun Hydro Electric Project in Nepal 30 january Sh. Nand Lal Sharma, Chairman &amp; Managing Director SJVN informed that Government of Nepal has allotted 679 MW Lower Arun Hydro Electric Project in Nepal to SJVN through","og:url":"https:\/\/newsnarad.com\/hi\/hydro-electric-project-in-nepal\/","article:published_time":"2021-01-31T05:48:03+00:00","article:modified_time":"2021-01-31T05:49:58+00:00","twitter:card":"summary_large_image","twitter:title":"Hydro Electric Project in Nepal - \u0928\u094d\u092f\u0942\u091c\u093c \u0928\u093e\u0930\u0926 | \u0909\u0924\u094d\u0924\u0930 \u092d\u093e\u0930\u0924 \u0915\u0940 \u0924\u093e\u091c\u093c\u093e \u0914\u0930 \u0924\u093e\u091c\u093c\u093e \u0916\u093c\u092c\u0930\u0947\u0902","twitter:description":"\u0915\u094d\u0937\u092e\u093e \u0915\u0930\u0947\u0902, \u092f\u0939 \u0938\u092e\u093e\u091a\u093e\u0930 \u0906\u092a\u0915\u0947 \u0905\u0928\u0941\u0930\u094b\u0927 \u0915\u0940 \u092d\u093e\u0937\u093e \u092e\u0947\u0902 \u0909\u092a\u0932\u092c\u094d\u0927 \u0928\u0939\u0940\u0902 \u0939\u0948\u0964 \u0915\u0943\u092a\u092f\u093e \u092f\u0939\u093e\u0901 \u0926\u0947\u0916\u0947\u0902\u0964SJVN Bags 679 MW Lower Arun Hydro Electric Project in Nepal 30 january Sh. Nand Lal Sharma, Chairman &amp; Managing Director SJVN informed that Government of Nepal has allotted 679 MW Lower Arun Hydro Electric Project in Nepal to SJVN through"},"aioseo_meta_data":{"post_id":"26622","title":null,"description":null,"keywords":null,"keyphrases":null,"primary_term":null,"canonical_url":null,"og_title":null,"og_description":null,"og_object_type":"default","og_image_type":"default","og_image_url":null,"og_image_width":null,"og_image_height":null,"og_image_custom_url":null,"og_image_custom_fields":null,"og_video":null,"og_custom_url":null,"og_article_section":null,"og_article_tags":null,"twitter_use_og":false,"twitter_card":"default","twitter_image_type":"default","twitter_image_url":null,"twitter_image_custom_url":null,"twitter_image_custom_fields":null,"twitter_title":null,"twitter_description":null,"schema":{"blockGraphs":[],"customGraphs":[],"default":{"data":{"Article":[],"Course":[],"Dataset":[],"FAQPage":[],"Movie":[],"Person":[],"Product":[],"ProductReview":[],"Car":[],"Recipe":[],"Service":[],"SoftwareApplication":[],"WebPage":[]},"graphName":"","isEnabled":true},"graphs":[]},"schema_type":"default","schema_type_options":null,"pillar_content":false,"robots_default":true,"robots_noindex":false,"robots_noarchive":false,"robots_nosnippet":false,"robots_nofollow":false,"robots_noimageindex":false,"robots_noodp":false,"robots_notranslate":false,"robots_max_snippet":null,"robots_max_videopreview":null,"robots_max_imagepreview":"large","priority":null,"frequency":null,"local_seo":null,"breadcrumb_settings":null,"limit_modified_date":false,"ai":null,"created":"2025-03-09 01:07:37","updated":"2025-06-04 20:50:38","seo_analyzer_scan_date":null},"aioseo_breadcrumb":"<div class=\"aioseo-breadcrumbs\"><span class=\"aioseo-breadcrumb\">\n\t\t\t<a href=\"https:\/\/newsnarad.com\/hi\" title=\"Home\">Home<\/a>\n\t\t<\/span><span class=\"aioseo-breadcrumb-separator\">&raquo;<\/span><span class=\"aioseo-breadcrumb\">\n\t\t\t<a href=\"https:\/\/newsnarad.com\/hi\/category\/politics\/\" title=\"\u0930\u093e\u091c\u0928\u0940\u0924\u093f\">\u0930\u093e\u091c\u0928\u0940\u0924\u093f<\/a>\n\t\t<\/span><span class=\"aioseo-breadcrumb-separator\">&raquo;<\/span><span class=\"aioseo-breadcrumb\">\n\t\t\tHydro Electric Project in Nepal\n\t\t<\/span><\/div>","aioseo_breadcrumb_json":[{"label":"Home","link":"https:\/\/newsnarad.com\/hi"},{"label":"\u0930\u093e\u091c\u0928\u0940\u0924\u093f","link":"https:\/\/newsnarad.com\/hi\/category\/politics\/"},{"label":"Hydro Electric Project in Nepal","link":"https:\/\/newsnarad.com\/hi\/hydro-electric-project-in-nepal\/"}],"_links":{"self":[{"href":"https:\/\/newsnarad.com\/hi\/wp-json\/wp\/v2\/posts\/26622","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/newsnarad.com\/hi\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/newsnarad.com\/hi\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/newsnarad.com\/hi\/wp-json\/wp\/v2\/users\/6"}],"replies":[{"embeddable":true,"href":"https:\/\/newsnarad.com\/hi\/wp-json\/wp\/v2\/comments?post=26622"}],"version-history":[{"count":0,"href":"https:\/\/newsnarad.com\/hi\/wp-json\/wp\/v2\/posts\/26622\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/newsnarad.com\/hi\/wp-json\/wp\/v2\/media\/26623"}],"wp:attachment":[{"href":"https:\/\/newsnarad.com\/hi\/wp-json\/wp\/v2\/media?parent=26622"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/newsnarad.com\/hi\/wp-json\/wp\/v2\/categories?post=26622"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/newsnarad.com\/hi\/wp-json\/wp\/v2\/tags?post=26622"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}