{"id":15881,"date":"2020-10-21T13:35:56","date_gmt":"2020-10-21T08:05:56","guid":{"rendered":"https:\/\/newsmakhani.com\/?p=15881"},"modified":"2020-10-21T13:35:56","modified_gmt":"2020-10-21T08:05:56","slug":"power-shutdown-in-jammu-2","status":"publish","type":"post","link":"https:\/\/newsnarad.com\/pa\/power-shutdown-in-jammu-2\/","title":{"rendered":"Power shutdown in Jammu"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-pa\">\u0a2e\u0a3e\u0a2b\u0a3c \u0a15\u0a30\u0a28\u0a3e, \u0a07\u0a39 \u0a16\u0a2c\u0a30 \u0a24\u0a41\u0a39\u0a3e\u0a21\u0a40 \u0a2c\u0a47\u0a28\u0a24\u0a40 \u0a2d\u0a3e\u0a38\u0a3c\u0a3e \u0a35\u0a3f\u0a71\u0a1a \u0a09\u0a2a\u0a32\u0a2c\u0a27 \u0a28\u0a39\u0a40\u0a02 \u0a39\u0a48\u0964 <a href=\"https:\/\/newsmakhani.com\/en\/\">\u0a15\u0a3f\u0a30\u0a2a\u0a3e \u0a15\u0a30\u0a15\u0a47 \u0a07\u0a71\u0a25\u0a47 \u0a26\u0a47\u0a16\u0a4b\u0964<\/a><\/p><p><\/p>\n<div>Chief Engineer (Distribution) JPDCL Jammu has told that for re-conductoring and structure fitting, the power supply to Mandal and its adjoining areas will remain affected on <strong>October 21 and 23 from 8 am to 2 pm<\/strong>.<\/div>\n<div>Similarly, to conduct the othet works, the power supply to <strong>Sunderpur<\/strong> and its adjoining areas will remain affected on <strong>October 21 from 8 am to 1 pm<\/strong>. The power supply to <strong>Makwal<\/strong> and its adjoining areas will remain affected on <strong>October 22 from 8 am to 1 pm<\/strong>. Same for the power supply to <strong>Prahladpur<\/strong> and its adjoining areas will remain affected on <strong>October 23 from 8 am to 1 pm<\/strong>.<\/div>\n<p><\/p>","protected":false},"excerpt":{"rendered":"<p>\u0a2e\u0a3e\u0a2b\u0a3c \u0a15\u0a30\u0a28\u0a3e, \u0a07\u0a39 \u0a16\u0a2c\u0a30 \u0a24\u0a41\u0a39\u0a3e\u0a21\u0a40 \u0a2c\u0a47\u0a28\u0a24\u0a40 \u0a2d\u0a3e\u0a38\u0a3c\u0a3e \u0a35\u0a3f\u0a71\u0a1a \u0a09\u0a2a\u0a32\u0a2c\u0a27 \u0a28\u0a39\u0a40\u0a02 \u0a39\u0a48\u0964 \u0a15\u0a3f\u0a30\u0a2a\u0a3e \u0a15\u0a30\u0a15\u0a47 \u0a07\u0a71\u0a25\u0a47 \u0a26\u0a47\u0a16\u0a4b\u0964 Chief Engineer (Distribution) JPDCL Jammu has told that for re-conductoring and structure fitting, the power supply to Mandal and its adjoining areas will remain affected on October 21 and 23 from 8 am to 2 pm. Similarly, to conduct the [&hellip;]<\/p>\n","protected":false},"author":6,"featured_media":15882,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[3037,122],"tags":[8764],"class_list":["post-15881","post","type-post","status-publish","format-standard","has-post-thumbnail","category-jammu","category-news","tag-power-shutdown-in-jammu"],"aioseo_notices":[],"_links":{"self":[{"href":"https:\/\/newsnarad.com\/pa\/wp-json\/wp\/v2\/posts\/15881","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/newsnarad.com\/pa\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/newsnarad.com\/pa\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/newsnarad.com\/pa\/wp-json\/wp\/v2\/users\/6"}],"replies":[{"embeddable":true,"href":"https:\/\/newsnarad.com\/pa\/wp-json\/wp\/v2\/comments?post=15881"}],"version-history":[{"count":0,"href":"https:\/\/newsnarad.com\/pa\/wp-json\/wp\/v2\/posts\/15881\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/newsnarad.com\/pa\/wp-json\/wp\/v2\/media\/15882"}],"wp:attachment":[{"href":"https:\/\/newsnarad.com\/pa\/wp-json\/wp\/v2\/media?parent=15881"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/newsnarad.com\/pa\/wp-json\/wp\/v2\/categories?post=15881"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/newsnarad.com\/pa\/wp-json\/wp\/v2\/tags?post=15881"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}