{"id":197608,"date":"2024-02-23T17:03:42","date_gmt":"2024-02-23T11:33:42","guid":{"rendered":"https:\/\/newsmakhani.com\/?p=197608"},"modified":"2024-02-24T09:24:45","modified_gmt":"2024-02-24T03:54:45","slug":"sjvn-commissions-50-mw-gujrai-solar-power-station-in-uttar-pradesh","status":"publish","type":"post","link":"https:\/\/newsnarad.com\/pa\/sjvn-commissions-50-mw-gujrai-solar-power-station-in-uttar-pradesh\/","title":{"rendered":"SJVN commissions 50 MW Gujrai Solar Power Station in Uttar Pradesh"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-pa\">\u0a2e\u0a3e\u0a2b\u0a3c \u0a15\u0a30\u0a28\u0a3e, \u0a07\u0a39 \u0a16\u0a2c\u0a30 \u0a24\u0a41\u0a39\u0a3e\u0a21\u0a40 \u0a2c\u0a47\u0a28\u0a24\u0a40 \u0a2d\u0a3e\u0a38\u0a3c\u0a3e \u0a35\u0a3f\u0a71\u0a1a \u0a09\u0a2a\u0a32\u0a2c\u0a27 \u0a28\u0a39\u0a40\u0a02 \u0a39\u0a48\u0964 <a href=\"https:\/\/newsmakhani.com\/en\/\">\u0a15\u0a3f\u0a30\u0a2a\u0a3e \u0a15\u0a30\u0a15\u0a47 \u0a07\u0a71\u0a25\u0a47 \u0a26\u0a47\u0a16\u0a4b\u0964<\/a><\/p><p><\/p>\n<div class=\"text-center\">\n<h3><strong><span style=\"color: #222222;font-family: Verdana, BlinkMacSystemFont, -apple-system, 'Segoe UI', Roboto, Oxygen, Ubuntu, Cantarell, 'Open Sans', 'Helvetica Neue', sans-serif;font-size: 15px\">Delhi, <\/span><\/strong><strong>23 FEB 2024\u00a0<\/strong><\/h3>\n<\/div>\n<p><a href=\"https:\/\/sjvn.nic.in\/\" target=\"_blank\" rel=\"noopener\">SJVN Limited<\/a>, a Mini Ratna, Category-I and Schedule \u2018A\u2019 Central public sector enterprise under the administrative control of Ministry of Power, Government of India, has begun the successful commercial operation of its\u00a050 MW Gujrai Solar Power Station in Kanpur Dehat, Uttar Pradesh\u00a0today, February 23, 2024. With this milestone, the total installed power capacity of SJVN stands at 2,277 MW, with ten power stations currently operational.<\/p>\n<p>The 50 MW Gujrai Solar Power Station has been executed by SJVN through its renewable arm, SJVN Green Energy Limited (SGEL)\u00a0at a cost of Rs.\u00a0281 crores.\u00a0The annual revenue from energy generated is expected to be approximately Rs. 32 crores.\u00a0The project will generate 107 million units in the first year and the cumulative energy generation over a period of 25 years is estimated to be 2,477 million units.<\/p>\n<p>Sharing this achievement, Chairperson &amp; Managing Director, Smt. Geeta Kapur said that SJVN is committed to increase the country\u2019s non-fossil-fuel-based energy generation and help achieve the target of Net Zero by the year 2070.<\/p>\n<p>SGEL secured this grid-connected solar project\u00a0in November 2022,\u00a0at a tariff of Rs. 2.98 per unit through\u00a0Tariff-based Competitive Bidding Process conducted by\u00a0the Uttar Pradesh New &amp; Renewable Energy Development Agency (UPNEDA).\u00a0The Power Purchase Agreement has been inked with\u00a0Uttar Pradesh Power Corporation Limited (UPPCL)\u00a0for a period of 25 years.<\/p>\n<p>SJVN has commissioned multiple renewable projects in recent times, thus paving the path for achieving its shared vision of attaining an installed capacity of 25 GW by the year 2030 and 50 GW by the year 2040.<\/p>","protected":false},"excerpt":{"rendered":"<p>\u0a2e\u0a3e\u0a2b\u0a3c \u0a15\u0a30\u0a28\u0a3e, \u0a07\u0a39 \u0a16\u0a2c\u0a30 \u0a24\u0a41\u0a39\u0a3e\u0a21\u0a40 \u0a2c\u0a47\u0a28\u0a24\u0a40 \u0a2d\u0a3e\u0a38\u0a3c\u0a3e \u0a35\u0a3f\u0a71\u0a1a \u0a09\u0a2a\u0a32\u0a2c\u0a27 \u0a28\u0a39\u0a40\u0a02 \u0a39\u0a48\u0964 \u0a15\u0a3f\u0a30\u0a2a\u0a3e \u0a15\u0a30\u0a15\u0a47 \u0a07\u0a71\u0a25\u0a47 \u0a26\u0a47\u0a16\u0a4b\u0964 Delhi, 23 FEB 2024\u00a0 SJVN Limited, a Mini Ratna, Category-I and Schedule \u2018A\u2019 Central public sector enterprise under the administrative control of Ministry of Power, Government of India, has begun the successful commercial operation of its\u00a050 MW Gujrai Solar Power [&hellip;]<\/p>\n","protected":false},"author":17,"featured_media":197609,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[109,122,177],"tags":[108283,56731,108282,108284],"class_list":["post-197608","post","type-post","status-publish","format-standard","has-post-thumbnail","category-national","category-news","category-uttar-pradesh","tag-chairperson-managing-director-smt-geeta-kapur","tag-news-makhani","tag-sjvn-commissions-50-mw-gujrai-solar-power-station","tag-uttar-pradesh-new-renewable-energy-development-agency"],"aioseo_notices":[],"aioseo_head":"\n\t\t<!-- All in One SEO 5.0.3 - aioseo.com -->\n\t<meta name=\"description\" content=\"\u0a2e\u0a3e\u0a2b\u0a3c \u0a15\u0a30\u0a28\u0a3e, \u0a07\u0a39 \u0a16\u0a2c\u0a30 \u0a24\u0a41\u0a39\u0a3e\u0a21\u0a40 \u0a2c\u0a47\u0a28\u0a24\u0a40 \u0a2d\u0a3e\u0a38\u0a3c\u0a3e \u0a35\u0a3f\u0a71\u0a1a \u0a09\u0a2a\u0a32\u0a2c\u0a27 \u0a28\u0a39\u0a40\u0a02 \u0a39\u0a48\u0964 \u0a15\u0a3f\u0a30\u0a2a\u0a3e \u0a15\u0a30\u0a15\u0a47 \u0a07\u0a71\u0a25\u0a47 \u0a26\u0a47\u0a16\u0a4b\u0964Delhi, 23 FEB 2024 SJVN Limited, a Mini Ratna, Category-I and Schedule \u2018A\u2019 Central public sector enterprise under the administrative control of Ministry of Power, Government of India, has begun the successful commercial operation of its 50 MW Gujrai Solar Power Station\" \/>\n\t<meta name=\"robots\" content=\"max-image-preview:large\" \/>\n\t<meta name=\"author\" content=\"Neha Choudhary\"\/>\n\t<link rel=\"canonical\" href=\"https:\/\/newsnarad.com\/pa\/sjvn-commissions-50-mw-gujrai-solar-power-station-in-uttar-pradesh\/\" \/>\n\t\t<meta name=\"generator\" content=\"All in One SEO (AIOSEO) 5.0.3\" \/>\n\t\t<meta property=\"og:locale\" content=\"pa_IN\" \/>\n\t\t<meta property=\"og:site_name\" content=\"News Narad | \u0a28\u0a3f\u0a0a\u0a1c\u0a3c \u0a28\u0a3e\u0a30\u0a26 | \u0a09\u0a71\u0a24\u0a30 \u0a2d\u0a3e\u0a30\u0a24 \u0a26\u0a40\u0a06\u0a02 \u0a24\u0a3e\u0a1c\u0a3c\u0a3e \u0a16\u0a3c\u0a2c\u0a30\u0a3e\u0a02 - \u0a28\u0a3f\u0a0a\u0a1c\u0a3c \u0a28\u0a3e\u0a30\u0a26 | \u0a09\u0a71\u0a24\u0a30 \u0a2d\u0a3e\u0a30\u0a24 \u0a26\u0a40\u0a06\u0a02 \u0a24\u0a3e\u0a1c\u0a3c\u0a3e \u0a16\u0a3c\u0a2c\u0a30\u0a3e\u0a02 \u0a1c\u0a3f\u0a28\u0a4d\u0a39\u0a3e\u0a02 \u0a35\u0a3f\u0a71\u0a1a \u0a2a\u0a70\u0a1c\u0a3e\u0a2c, \u0a39\u0a30\u0a3f\u0a06\u0a23\u0a3e, \u0a39\u0a3f\u0a2e\u0a3e\u0a1a\u0a32 \u0a2a\u0a4d\u0a30\u0a26\u0a47\u0a38\u0a3c, \u0a2f\u0a42\u0a2a\u0a40, \u0a2c\u0a3f\u0a39\u0a3e\u0a30, \u0a1c\u0a70\u0a2e\u0a42 \u0a15\u0a38\u0a3c\u0a2e\u0a40\u0a30 \u0a30\u0a3e\u0a1c\u0a38\u0a25\u0a3e\u0a28, \u0a09\u0a71\u0a24\u0a30\u0a3e\u0a16\u0a70\u0a21, \u0a1a\u0a70\u0a21\u0a40\u0a17\u0a5c\u0a4d\u0a39, \u0a26\u0a3f\u0a71\u0a32\u0a40 \u0a10\u0a28\u0a38\u0a40\u0a06\u0a30 \u0a06\u0a26\u0a3f \u0a38\u0a3c\u0a3e\u0a2e\u0a32 \u0a39\u0a28\" \/>\n\t\t<meta property=\"og:type\" content=\"article\" \/>\n\t\t<meta property=\"og:title\" content=\"SJVN commissions 50 MW Gujrai Solar Power Station in Uttar Pradesh - News Narad | \u0a28\u0a3f\u0a0a\u0a1c\u0a3c \u0a28\u0a3e\u0a30\u0a26 | \u0a09\u0a71\u0a24\u0a30 \u0a2d\u0a3e\u0a30\u0a24 \u0a26\u0a40\u0a06\u0a02 \u0a24\u0a3e\u0a1c\u0a3c\u0a3e \u0a16\u0a3c\u0a2c\u0a30\u0a3e\u0a02\" \/>\n\t\t<meta property=\"og:description\" content=\"\u0a2e\u0a3e\u0a2b\u0a3c \u0a15\u0a30\u0a28\u0a3e, \u0a07\u0a39 \u0a16\u0a2c\u0a30 \u0a24\u0a41\u0a39\u0a3e\u0a21\u0a40 \u0a2c\u0a47\u0a28\u0a24\u0a40 \u0a2d\u0a3e\u0a38\u0a3c\u0a3e \u0a35\u0a3f\u0a71\u0a1a \u0a09\u0a2a\u0a32\u0a2c\u0a27 \u0a28\u0a39\u0a40\u0a02 \u0a39\u0a48\u0964 \u0a15\u0a3f\u0a30\u0a2a\u0a3e \u0a15\u0a30\u0a15\u0a47 \u0a07\u0a71\u0a25\u0a47 \u0a26\u0a47\u0a16\u0a4b\u0964Delhi, 23 FEB 2024 SJVN Limited, a Mini Ratna, Category-I and Schedule \u2018A\u2019 Central public sector enterprise under the administrative control of Ministry of Power, Government of India, has begun the successful commercial operation of its 50 MW Gujrai Solar Power Station\" \/>\n\t\t<meta property=\"og:url\" content=\"https:\/\/newsnarad.com\/pa\/sjvn-commissions-50-mw-gujrai-solar-power-station-in-uttar-pradesh\/\" \/>\n\t\t<meta property=\"article:published_time\" content=\"2024-02-23T11:33:42+00:00\" \/>\n\t\t<meta property=\"article:modified_time\" content=\"2024-02-24T03:54:45+00:00\" \/>\n\t\t<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n\t\t<meta name=\"twitter:title\" content=\"SJVN commissions 50 MW Gujrai Solar Power Station in Uttar Pradesh - News Narad | \u0a28\u0a3f\u0a0a\u0a1c\u0a3c \u0a28\u0a3e\u0a30\u0a26 | \u0a09\u0a71\u0a24\u0a30 \u0a2d\u0a3e\u0a30\u0a24 \u0a26\u0a40\u0a06\u0a02 \u0a24\u0a3e\u0a1c\u0a3c\u0a3e \u0a16\u0a3c\u0a2c\u0a30\u0a3e\u0a02\" \/>\n\t\t<meta name=\"twitter:description\" content=\"\u0a2e\u0a3e\u0a2b\u0a3c \u0a15\u0a30\u0a28\u0a3e, \u0a07\u0a39 \u0a16\u0a2c\u0a30 \u0a24\u0a41\u0a39\u0a3e\u0a21\u0a40 \u0a2c\u0a47\u0a28\u0a24\u0a40 \u0a2d\u0a3e\u0a38\u0a3c\u0a3e \u0a35\u0a3f\u0a71\u0a1a \u0a09\u0a2a\u0a32\u0a2c\u0a27 \u0a28\u0a39\u0a40\u0a02 \u0a39\u0a48\u0964 \u0a15\u0a3f\u0a30\u0a2a\u0a3e \u0a15\u0a30\u0a15\u0a47 \u0a07\u0a71\u0a25\u0a47 \u0a26\u0a47\u0a16\u0a4b\u0964Delhi, 23 FEB 2024 SJVN Limited, a Mini Ratna, Category-I and Schedule \u2018A\u2019 Central public sector enterprise under the administrative control of Ministry of Power, Government of India, has begun the successful commercial operation of its 50 MW Gujrai Solar Power Station\" \/>\n\t\t<script type=\"application\/ld+json\" class=\"aioseo-schema\">\n\t\t\t{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"BlogPosting\",\"@id\":\"https:\\\/\\\/newsnarad.com\\\/pa\\\/sjvn-commissions-50-mw-gujrai-solar-power-station-in-uttar-pradesh\\\/#blogposting\",\"name\":\"SJVN commissions 50 MW Gujrai Solar Power Station in Uttar Pradesh - News Narad | \\u0a28\\u0a3f\\u0a0a\\u0a1c\\u0a3c \\u0a28\\u0a3e\\u0a30\\u0a26 | \\u0a09\\u0a71\\u0a24\\u0a30 \\u0a2d\\u0a3e\\u0a30\\u0a24 \\u0a26\\u0a40\\u0a06\\u0a02 \\u0a24\\u0a3e\\u0a1c\\u0a3c\\u0a3e \\u0a16\\u0a3c\\u0a2c\\u0a30\\u0a3e\\u0a02\",\"headline\":\"SJVN commissions 50 MW Gujrai Solar Power Station in Uttar Pradesh\",\"author\":{\"@id\":\"https:\\\/\\\/newsnarad.com\\\/pa\\\/author\\\/nehaj8124gmail-com\\\/#author\"},\"publisher\":{\"@id\":\"https:\\\/\\\/newsnarad.com\\\/pa\\\/#organization\"},\"image\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/newsnarad.com\\\/wp-content\\\/uploads\\\/2024\\\/02\\\/Solar.jpg\",\"width\":1280,\"height\":720},\"datePublished\":\"2024-02-23T17:03:42+05:30\",\"dateModified\":\"2024-02-24T09:24:45+05:30\",\"inLanguage\":\"pa-IN\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/newsnarad.com\\\/pa\\\/sjvn-commissions-50-mw-gujrai-solar-power-station-in-uttar-pradesh\\\/#webpage\"},\"isPartOf\":{\"@id\":\"https:\\\/\\\/newsnarad.com\\\/pa\\\/sjvn-commissions-50-mw-gujrai-solar-power-station-in-uttar-pradesh\\\/#webpage\"},\"articleSection\":\"\\u0a30\\u0a3e\\u0a38\\u0a3c\\u0a1f\\u0a30\\u0a40, \\u0a16\\u0a3c\\u0a2c\\u0a30\\u0a3e\\u0a02, \\u0a09\\u0a71\\u0a24\\u0a30 \\u0a2a\\u0a4d\\u0a30\\u0a26\\u0a47\\u0a38\\u0a3c, Chairperson &amp; Managing Director Smt. Geeta Kapur, news makhani, SJVN commissions 50 MW Gujrai Solar Power Station, Uttar Pradesh New &amp; Renewable Energy Development Agency\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/newsnarad.com\\\/pa\\\/sjvn-commissions-50-mw-gujrai-solar-power-station-in-uttar-pradesh\\\/#breadcrumblist\",\"itemListElement\":[{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/newsnarad.com\\\/pa\\\/#listItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/newsnarad.com\\\/pa\\\/\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/newsnarad.com\\\/pa\\\/category\\\/national\\\/#listItem\",\"name\":\"\\u0a30\\u0a3e\\u0a38\\u0a3c\\u0a1f\\u0a30\\u0a40\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/newsnarad.com\\\/pa\\\/category\\\/national\\\/#listItem\",\"position\":2,\"name\":\"\\u0a30\\u0a3e\\u0a38\\u0a3c\\u0a1f\\u0a30\\u0a40\",\"item\":\"https:\\\/\\\/newsnarad.com\\\/pa\\\/category\\\/national\\\/\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/newsnarad.com\\\/pa\\\/sjvn-commissions-50-mw-gujrai-solar-power-station-in-uttar-pradesh\\\/#listItem\",\"name\":\"SJVN commissions 50 MW Gujrai Solar Power Station in Uttar Pradesh\"},\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/newsnarad.com\\\/pa\\\/#listItem\",\"name\":\"Home\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/newsnarad.com\\\/pa\\\/sjvn-commissions-50-mw-gujrai-solar-power-station-in-uttar-pradesh\\\/#listItem\",\"position\":3,\"name\":\"SJVN commissions 50 MW Gujrai Solar Power Station in Uttar Pradesh\",\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/newsnarad.com\\\/pa\\\/category\\\/national\\\/#listItem\",\"name\":\"\\u0a30\\u0a3e\\u0a38\\u0a3c\\u0a1f\\u0a30\\u0a40\"}}]},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/newsnarad.com\\\/pa\\\/#organization\",\"name\":\"News Narad | \\u0a28\\u0a3f\\u0a0a\\u0a1c\\u0a3c \\u0a28\\u0a3e\\u0a30\\u0a26 | \\u0a09\\u0a71\\u0a24\\u0a30 \\u0a2d\\u0a3e\\u0a30\\u0a24 \\u0a26\\u0a40\\u0a06\\u0a02 \\u0a24\\u0a3e\\u0a1c\\u0a3c\\u0a3e \\u0a16\\u0a3c\\u0a2c\\u0a30\\u0a3e\\u0a02\",\"description\":\"\\u0a28\\u0a3f\\u0a0a\\u0a1c\\u0a3c \\u0a28\\u0a3e\\u0a30\\u0a26 | \\u0a09\\u0a71\\u0a24\\u0a30 \\u0a2d\\u0a3e\\u0a30\\u0a24 \\u0a26\\u0a40\\u0a06\\u0a02 \\u0a24\\u0a3e\\u0a1c\\u0a3c\\u0a3e \\u0a16\\u0a3c\\u0a2c\\u0a30\\u0a3e\\u0a02 \\u0a1c\\u0a3f\\u0a28\\u0a4d\\u0a39\\u0a3e\\u0a02 \\u0a35\\u0a3f\\u0a71\\u0a1a \\u0a2a\\u0a70\\u0a1c\\u0a3e\\u0a2c, \\u0a39\\u0a30\\u0a3f\\u0a06\\u0a23\\u0a3e, \\u0a39\\u0a3f\\u0a2e\\u0a3e\\u0a1a\\u0a32 \\u0a2a\\u0a4d\\u0a30\\u0a26\\u0a47\\u0a38\\u0a3c, \\u0a2f\\u0a42\\u0a2a\\u0a40, \\u0a2c\\u0a3f\\u0a39\\u0a3e\\u0a30, \\u0a1c\\u0a70\\u0a2e\\u0a42 \\u0a15\\u0a38\\u0a3c\\u0a2e\\u0a40\\u0a30 \\u0a30\\u0a3e\\u0a1c\\u0a38\\u0a25\\u0a3e\\u0a28, \\u0a09\\u0a71\\u0a24\\u0a30\\u0a3e\\u0a16\\u0a70\\u0a21, \\u0a1a\\u0a70\\u0a21\\u0a40\\u0a17\\u0a5c\\u0a4d\\u0a39, \\u0a26\\u0a3f\\u0a71\\u0a32\\u0a40 \\u0a10\\u0a28\\u0a38\\u0a40\\u0a06\\u0a30 \\u0a06\\u0a26\\u0a3f \\u0a38\\u0a3c\\u0a3e\\u0a2e\\u0a32 \\u0a39\\u0a28\",\"url\":\"https:\\\/\\\/newsnarad.com\\\/pa\\\/\"},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/newsnarad.com\\\/pa\\\/author\\\/nehaj8124gmail-com\\\/#author\",\"url\":\"https:\\\/\\\/newsnarad.com\\\/pa\\\/author\\\/nehaj8124gmail-com\\\/\",\"name\":\"Neha Choudhary\",\"image\":{\"@type\":\"ImageObject\",\"@id\":\"https:\\\/\\\/newsnarad.com\\\/pa\\\/sjvn-commissions-50-mw-gujrai-solar-power-station-in-uttar-pradesh\\\/#authorImage\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/2ccdd479ae6fc5d3c58f4463eca2cd40a6f786d6e2824f9291acd70bef0bef49?s=96&d=mm&r=g\",\"width\":96,\"height\":96,\"caption\":\"Neha Choudhary\"}},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/newsnarad.com\\\/pa\\\/sjvn-commissions-50-mw-gujrai-solar-power-station-in-uttar-pradesh\\\/#webpage\",\"url\":\"https:\\\/\\\/newsnarad.com\\\/pa\\\/sjvn-commissions-50-mw-gujrai-solar-power-station-in-uttar-pradesh\\\/\",\"name\":\"SJVN commissions 50 MW Gujrai Solar Power Station in Uttar Pradesh - News Narad | \\u0a28\\u0a3f\\u0a0a\\u0a1c\\u0a3c \\u0a28\\u0a3e\\u0a30\\u0a26 | \\u0a09\\u0a71\\u0a24\\u0a30 \\u0a2d\\u0a3e\\u0a30\\u0a24 \\u0a26\\u0a40\\u0a06\\u0a02 \\u0a24\\u0a3e\\u0a1c\\u0a3c\\u0a3e \\u0a16\\u0a3c\\u0a2c\\u0a30\\u0a3e\\u0a02\",\"description\":\"\\u0a2e\\u0a3e\\u0a2b\\u0a3c \\u0a15\\u0a30\\u0a28\\u0a3e, \\u0a07\\u0a39 \\u0a16\\u0a2c\\u0a30 \\u0a24\\u0a41\\u0a39\\u0a3e\\u0a21\\u0a40 \\u0a2c\\u0a47\\u0a28\\u0a24\\u0a40 \\u0a2d\\u0a3e\\u0a38\\u0a3c\\u0a3e \\u0a35\\u0a3f\\u0a71\\u0a1a \\u0a09\\u0a2a\\u0a32\\u0a2c\\u0a27 \\u0a28\\u0a39\\u0a40\\u0a02 \\u0a39\\u0a48\\u0964 \\u0a15\\u0a3f\\u0a30\\u0a2a\\u0a3e \\u0a15\\u0a30\\u0a15\\u0a47 \\u0a07\\u0a71\\u0a25\\u0a47 \\u0a26\\u0a47\\u0a16\\u0a4b\\u0964Delhi, 23 FEB 2024 SJVN Limited, a Mini Ratna, Category-I and Schedule \\u2018A\\u2019 Central public sector enterprise under the administrative control of Ministry of Power, Government of India, has begun the successful commercial operation of its 50 MW Gujrai Solar Power Station\",\"inLanguage\":\"pa-IN\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/newsnarad.com\\\/pa\\\/#website\"},\"breadcrumb\":{\"@id\":\"https:\\\/\\\/newsnarad.com\\\/pa\\\/sjvn-commissions-50-mw-gujrai-solar-power-station-in-uttar-pradesh\\\/#breadcrumblist\"},\"author\":{\"@id\":\"https:\\\/\\\/newsnarad.com\\\/pa\\\/author\\\/nehaj8124gmail-com\\\/#author\"},\"creator\":{\"@id\":\"https:\\\/\\\/newsnarad.com\\\/pa\\\/author\\\/nehaj8124gmail-com\\\/#author\"},\"image\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/newsnarad.com\\\/wp-content\\\/uploads\\\/2024\\\/02\\\/Solar.jpg\",\"@id\":\"https:\\\/\\\/newsnarad.com\\\/pa\\\/sjvn-commissions-50-mw-gujrai-solar-power-station-in-uttar-pradesh\\\/#mainImage\",\"width\":1280,\"height\":720},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/newsnarad.com\\\/pa\\\/sjvn-commissions-50-mw-gujrai-solar-power-station-in-uttar-pradesh\\\/#mainImage\"},\"datePublished\":\"2024-02-23T17:03:42+05:30\",\"dateModified\":\"2024-02-24T09:24:45+05:30\"},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/newsnarad.com\\\/pa\\\/#website\",\"url\":\"https:\\\/\\\/newsnarad.com\\\/pa\\\/\",\"name\":\"News Narad | \\u0a28\\u0a3f\\u0a0a\\u0a1c\\u0a3c \\u0a28\\u0a3e\\u0a30\\u0a26 | \\u0a09\\u0a71\\u0a24\\u0a30 \\u0a2d\\u0a3e\\u0a30\\u0a24 \\u0a26\\u0a40\\u0a06\\u0a02 \\u0a24\\u0a3e\\u0a1c\\u0a3c\\u0a3e \\u0a16\\u0a3c\\u0a2c\\u0a30\\u0a3e\\u0a02\",\"description\":\"\\u0a28\\u0a3f\\u0a0a\\u0a1c\\u0a3c \\u0a28\\u0a3e\\u0a30\\u0a26 | \\u0a09\\u0a71\\u0a24\\u0a30 \\u0a2d\\u0a3e\\u0a30\\u0a24 \\u0a26\\u0a40\\u0a06\\u0a02 \\u0a24\\u0a3e\\u0a1c\\u0a3c\\u0a3e \\u0a16\\u0a3c\\u0a2c\\u0a30\\u0a3e\\u0a02 \\u0a1c\\u0a3f\\u0a28\\u0a4d\\u0a39\\u0a3e\\u0a02 \\u0a35\\u0a3f\\u0a71\\u0a1a \\u0a2a\\u0a70\\u0a1c\\u0a3e\\u0a2c, \\u0a39\\u0a30\\u0a3f\\u0a06\\u0a23\\u0a3e, \\u0a39\\u0a3f\\u0a2e\\u0a3e\\u0a1a\\u0a32 \\u0a2a\\u0a4d\\u0a30\\u0a26\\u0a47\\u0a38\\u0a3c, \\u0a2f\\u0a42\\u0a2a\\u0a40, \\u0a2c\\u0a3f\\u0a39\\u0a3e\\u0a30, \\u0a1c\\u0a70\\u0a2e\\u0a42 \\u0a15\\u0a38\\u0a3c\\u0a2e\\u0a40\\u0a30 \\u0a30\\u0a3e\\u0a1c\\u0a38\\u0a25\\u0a3e\\u0a28, \\u0a09\\u0a71\\u0a24\\u0a30\\u0a3e\\u0a16\\u0a70\\u0a21, \\u0a1a\\u0a70\\u0a21\\u0a40\\u0a17\\u0a5c\\u0a4d\\u0a39, \\u0a26\\u0a3f\\u0a71\\u0a32\\u0a40 \\u0a10\\u0a28\\u0a38\\u0a40\\u0a06\\u0a30 \\u0a06\\u0a26\\u0a3f \\u0a38\\u0a3c\\u0a3e\\u0a2e\\u0a32 \\u0a39\\u0a28\",\"inLanguage\":\"pa-IN\",\"publisher\":{\"@id\":\"https:\\\/\\\/newsnarad.com\\\/pa\\\/#organization\"}}]}\n\t\t<\/script>\n\t\t<!-- All in One SEO -->\n\n","aioseo_head_json":{"title":"SJVN commissions 50 MW Gujrai Solar Power Station in Uttar Pradesh - News Narad | \u0a28\u0a3f\u0a0a\u0a1c\u0a3c \u0a28\u0a3e\u0a30\u0a26 | \u0a09\u0a71\u0a24\u0a30 \u0a2d\u0a3e\u0a30\u0a24 \u0a26\u0a40\u0a06\u0a02 \u0a24\u0a3e\u0a1c\u0a3c\u0a3e \u0a16\u0a3c\u0a2c\u0a30\u0a3e\u0a02","description":"\u0a2e\u0a3e\u0a2b\u0a3c \u0a15\u0a30\u0a28\u0a3e, \u0a07\u0a39 \u0a16\u0a2c\u0a30 \u0a24\u0a41\u0a39\u0a3e\u0a21\u0a40 \u0a2c\u0a47\u0a28\u0a24\u0a40 \u0a2d\u0a3e\u0a38\u0a3c\u0a3e \u0a35\u0a3f\u0a71\u0a1a \u0a09\u0a2a\u0a32\u0a2c\u0a27 \u0a28\u0a39\u0a40\u0a02 \u0a39\u0a48\u0964 \u0a15\u0a3f\u0a30\u0a2a\u0a3e \u0a15\u0a30\u0a15\u0a47 \u0a07\u0a71\u0a25\u0a47 \u0a26\u0a47\u0a16\u0a4b\u0964Delhi, 23 FEB 2024 SJVN Limited, a Mini Ratna, Category-I and Schedule \u2018A\u2019 Central public sector enterprise under the administrative control of Ministry of Power, Government of India, has begun the successful commercial operation of its 50 MW Gujrai Solar Power Station","canonical_url":"https:\/\/newsnarad.com\/pa\/sjvn-commissions-50-mw-gujrai-solar-power-station-in-uttar-pradesh\/","robots":"max-image-preview:large","keywords":"","webmasterTools":{"miscellaneous":""},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"BlogPosting","@id":"https:\/\/newsnarad.com\/pa\/sjvn-commissions-50-mw-gujrai-solar-power-station-in-uttar-pradesh\/#blogposting","name":"SJVN commissions 50 MW Gujrai Solar Power Station in Uttar Pradesh - News Narad | \u0a28\u0a3f\u0a0a\u0a1c\u0a3c \u0a28\u0a3e\u0a30\u0a26 | \u0a09\u0a71\u0a24\u0a30 \u0a2d\u0a3e\u0a30\u0a24 \u0a26\u0a40\u0a06\u0a02 \u0a24\u0a3e\u0a1c\u0a3c\u0a3e \u0a16\u0a3c\u0a2c\u0a30\u0a3e\u0a02","headline":"SJVN commissions 50 MW Gujrai Solar Power Station in Uttar Pradesh","author":{"@id":"https:\/\/newsnarad.com\/pa\/author\/nehaj8124gmail-com\/#author"},"publisher":{"@id":"https:\/\/newsnarad.com\/pa\/#organization"},"image":{"@type":"ImageObject","url":"https:\/\/newsnarad.com\/wp-content\/uploads\/2024\/02\/Solar.jpg","width":1280,"height":720},"datePublished":"2024-02-23T17:03:42+05:30","dateModified":"2024-02-24T09:24:45+05:30","inLanguage":"pa-IN","mainEntityOfPage":{"@id":"https:\/\/newsnarad.com\/pa\/sjvn-commissions-50-mw-gujrai-solar-power-station-in-uttar-pradesh\/#webpage"},"isPartOf":{"@id":"https:\/\/newsnarad.com\/pa\/sjvn-commissions-50-mw-gujrai-solar-power-station-in-uttar-pradesh\/#webpage"},"articleSection":"\u0a30\u0a3e\u0a38\u0a3c\u0a1f\u0a30\u0a40, \u0a16\u0a3c\u0a2c\u0a30\u0a3e\u0a02, \u0a09\u0a71\u0a24\u0a30 \u0a2a\u0a4d\u0a30\u0a26\u0a47\u0a38\u0a3c, Chairperson &amp; Managing Director Smt. Geeta Kapur, news makhani, SJVN commissions 50 MW Gujrai Solar Power Station, Uttar Pradesh New &amp; Renewable Energy Development Agency"},{"@type":"BreadcrumbList","@id":"https:\/\/newsnarad.com\/pa\/sjvn-commissions-50-mw-gujrai-solar-power-station-in-uttar-pradesh\/#breadcrumblist","itemListElement":[{"@type":"ListItem","@id":"https:\/\/newsnarad.com\/pa\/#listItem","position":1,"name":"Home","item":"https:\/\/newsnarad.com\/pa\/","nextItem":{"@type":"ListItem","@id":"https:\/\/newsnarad.com\/pa\/category\/national\/#listItem","name":"\u0a30\u0a3e\u0a38\u0a3c\u0a1f\u0a30\u0a40"}},{"@type":"ListItem","@id":"https:\/\/newsnarad.com\/pa\/category\/national\/#listItem","position":2,"name":"\u0a30\u0a3e\u0a38\u0a3c\u0a1f\u0a30\u0a40","item":"https:\/\/newsnarad.com\/pa\/category\/national\/","nextItem":{"@type":"ListItem","@id":"https:\/\/newsnarad.com\/pa\/sjvn-commissions-50-mw-gujrai-solar-power-station-in-uttar-pradesh\/#listItem","name":"SJVN commissions 50 MW Gujrai Solar Power Station in Uttar Pradesh"},"previousItem":{"@type":"ListItem","@id":"https:\/\/newsnarad.com\/pa\/#listItem","name":"Home"}},{"@type":"ListItem","@id":"https:\/\/newsnarad.com\/pa\/sjvn-commissions-50-mw-gujrai-solar-power-station-in-uttar-pradesh\/#listItem","position":3,"name":"SJVN commissions 50 MW Gujrai Solar Power Station in Uttar Pradesh","previousItem":{"@type":"ListItem","@id":"https:\/\/newsnarad.com\/pa\/category\/national\/#listItem","name":"\u0a30\u0a3e\u0a38\u0a3c\u0a1f\u0a30\u0a40"}}]},{"@type":"Organization","@id":"https:\/\/newsnarad.com\/pa\/#organization","name":"News Narad | \u0a28\u0a3f\u0a0a\u0a1c\u0a3c \u0a28\u0a3e\u0a30\u0a26 | \u0a09\u0a71\u0a24\u0a30 \u0a2d\u0a3e\u0a30\u0a24 \u0a26\u0a40\u0a06\u0a02 \u0a24\u0a3e\u0a1c\u0a3c\u0a3e \u0a16\u0a3c\u0a2c\u0a30\u0a3e\u0a02","description":"\u0a28\u0a3f\u0a0a\u0a1c\u0a3c \u0a28\u0a3e\u0a30\u0a26 | \u0a09\u0a71\u0a24\u0a30 \u0a2d\u0a3e\u0a30\u0a24 \u0a26\u0a40\u0a06\u0a02 \u0a24\u0a3e\u0a1c\u0a3c\u0a3e \u0a16\u0a3c\u0a2c\u0a30\u0a3e\u0a02 \u0a1c\u0a3f\u0a28\u0a4d\u0a39\u0a3e\u0a02 \u0a35\u0a3f\u0a71\u0a1a \u0a2a\u0a70\u0a1c\u0a3e\u0a2c, \u0a39\u0a30\u0a3f\u0a06\u0a23\u0a3e, \u0a39\u0a3f\u0a2e\u0a3e\u0a1a\u0a32 \u0a2a\u0a4d\u0a30\u0a26\u0a47\u0a38\u0a3c, \u0a2f\u0a42\u0a2a\u0a40, \u0a2c\u0a3f\u0a39\u0a3e\u0a30, \u0a1c\u0a70\u0a2e\u0a42 \u0a15\u0a38\u0a3c\u0a2e\u0a40\u0a30 \u0a30\u0a3e\u0a1c\u0a38\u0a25\u0a3e\u0a28, \u0a09\u0a71\u0a24\u0a30\u0a3e\u0a16\u0a70\u0a21, \u0a1a\u0a70\u0a21\u0a40\u0a17\u0a5c\u0a4d\u0a39, \u0a26\u0a3f\u0a71\u0a32\u0a40 \u0a10\u0a28\u0a38\u0a40\u0a06\u0a30 \u0a06\u0a26\u0a3f \u0a38\u0a3c\u0a3e\u0a2e\u0a32 \u0a39\u0a28","url":"https:\/\/newsnarad.com\/pa\/"},{"@type":"Person","@id":"https:\/\/newsnarad.com\/pa\/author\/nehaj8124gmail-com\/#author","url":"https:\/\/newsnarad.com\/pa\/author\/nehaj8124gmail-com\/","name":"Neha Choudhary","image":{"@type":"ImageObject","@id":"https:\/\/newsnarad.com\/pa\/sjvn-commissions-50-mw-gujrai-solar-power-station-in-uttar-pradesh\/#authorImage","url":"https:\/\/secure.gravatar.com\/avatar\/2ccdd479ae6fc5d3c58f4463eca2cd40a6f786d6e2824f9291acd70bef0bef49?s=96&d=mm&r=g","width":96,"height":96,"caption":"Neha Choudhary"}},{"@type":"WebPage","@id":"https:\/\/newsnarad.com\/pa\/sjvn-commissions-50-mw-gujrai-solar-power-station-in-uttar-pradesh\/#webpage","url":"https:\/\/newsnarad.com\/pa\/sjvn-commissions-50-mw-gujrai-solar-power-station-in-uttar-pradesh\/","name":"SJVN commissions 50 MW Gujrai Solar Power Station in Uttar Pradesh - News Narad | \u0a28\u0a3f\u0a0a\u0a1c\u0a3c \u0a28\u0a3e\u0a30\u0a26 | \u0a09\u0a71\u0a24\u0a30 \u0a2d\u0a3e\u0a30\u0a24 \u0a26\u0a40\u0a06\u0a02 \u0a24\u0a3e\u0a1c\u0a3c\u0a3e \u0a16\u0a3c\u0a2c\u0a30\u0a3e\u0a02","description":"\u0a2e\u0a3e\u0a2b\u0a3c \u0a15\u0a30\u0a28\u0a3e, \u0a07\u0a39 \u0a16\u0a2c\u0a30 \u0a24\u0a41\u0a39\u0a3e\u0a21\u0a40 \u0a2c\u0a47\u0a28\u0a24\u0a40 \u0a2d\u0a3e\u0a38\u0a3c\u0a3e \u0a35\u0a3f\u0a71\u0a1a \u0a09\u0a2a\u0a32\u0a2c\u0a27 \u0a28\u0a39\u0a40\u0a02 \u0a39\u0a48\u0964 \u0a15\u0a3f\u0a30\u0a2a\u0a3e \u0a15\u0a30\u0a15\u0a47 \u0a07\u0a71\u0a25\u0a47 \u0a26\u0a47\u0a16\u0a4b\u0964Delhi, 23 FEB 2024 SJVN Limited, a Mini Ratna, Category-I and Schedule \u2018A\u2019 Central public sector enterprise under the administrative control of Ministry of Power, Government of India, has begun the successful commercial operation of its 50 MW Gujrai Solar Power Station","inLanguage":"pa-IN","isPartOf":{"@id":"https:\/\/newsnarad.com\/pa\/#website"},"breadcrumb":{"@id":"https:\/\/newsnarad.com\/pa\/sjvn-commissions-50-mw-gujrai-solar-power-station-in-uttar-pradesh\/#breadcrumblist"},"author":{"@id":"https:\/\/newsnarad.com\/pa\/author\/nehaj8124gmail-com\/#author"},"creator":{"@id":"https:\/\/newsnarad.com\/pa\/author\/nehaj8124gmail-com\/#author"},"image":{"@type":"ImageObject","url":"https:\/\/newsnarad.com\/wp-content\/uploads\/2024\/02\/Solar.jpg","@id":"https:\/\/newsnarad.com\/pa\/sjvn-commissions-50-mw-gujrai-solar-power-station-in-uttar-pradesh\/#mainImage","width":1280,"height":720},"primaryImageOfPage":{"@id":"https:\/\/newsnarad.com\/pa\/sjvn-commissions-50-mw-gujrai-solar-power-station-in-uttar-pradesh\/#mainImage"},"datePublished":"2024-02-23T17:03:42+05:30","dateModified":"2024-02-24T09:24:45+05:30"},{"@type":"WebSite","@id":"https:\/\/newsnarad.com\/pa\/#website","url":"https:\/\/newsnarad.com\/pa\/","name":"News Narad | \u0a28\u0a3f\u0a0a\u0a1c\u0a3c \u0a28\u0a3e\u0a30\u0a26 | \u0a09\u0a71\u0a24\u0a30 \u0a2d\u0a3e\u0a30\u0a24 \u0a26\u0a40\u0a06\u0a02 \u0a24\u0a3e\u0a1c\u0a3c\u0a3e \u0a16\u0a3c\u0a2c\u0a30\u0a3e\u0a02","description":"\u0a28\u0a3f\u0a0a\u0a1c\u0a3c \u0a28\u0a3e\u0a30\u0a26 | \u0a09\u0a71\u0a24\u0a30 \u0a2d\u0a3e\u0a30\u0a24 \u0a26\u0a40\u0a06\u0a02 \u0a24\u0a3e\u0a1c\u0a3c\u0a3e \u0a16\u0a3c\u0a2c\u0a30\u0a3e\u0a02 \u0a1c\u0a3f\u0a28\u0a4d\u0a39\u0a3e\u0a02 \u0a35\u0a3f\u0a71\u0a1a \u0a2a\u0a70\u0a1c\u0a3e\u0a2c, \u0a39\u0a30\u0a3f\u0a06\u0a23\u0a3e, \u0a39\u0a3f\u0a2e\u0a3e\u0a1a\u0a32 \u0a2a\u0a4d\u0a30\u0a26\u0a47\u0a38\u0a3c, \u0a2f\u0a42\u0a2a\u0a40, \u0a2c\u0a3f\u0a39\u0a3e\u0a30, \u0a1c\u0a70\u0a2e\u0a42 \u0a15\u0a38\u0a3c\u0a2e\u0a40\u0a30 \u0a30\u0a3e\u0a1c\u0a38\u0a25\u0a3e\u0a28, \u0a09\u0a71\u0a24\u0a30\u0a3e\u0a16\u0a70\u0a21, \u0a1a\u0a70\u0a21\u0a40\u0a17\u0a5c\u0a4d\u0a39, \u0a26\u0a3f\u0a71\u0a32\u0a40 \u0a10\u0a28\u0a38\u0a40\u0a06\u0a30 \u0a06\u0a26\u0a3f \u0a38\u0a3c\u0a3e\u0a2e\u0a32 \u0a39\u0a28","inLanguage":"pa-IN","publisher":{"@id":"https:\/\/newsnarad.com\/pa\/#organization"}}]},"og:locale":"pa_IN","og:site_name":"News Narad | \u0a28\u0a3f\u0a0a\u0a1c\u0a3c \u0a28\u0a3e\u0a30\u0a26 | \u0a09\u0a71\u0a24\u0a30 \u0a2d\u0a3e\u0a30\u0a24 \u0a26\u0a40\u0a06\u0a02 \u0a24\u0a3e\u0a1c\u0a3c\u0a3e \u0a16\u0a3c\u0a2c\u0a30\u0a3e\u0a02 - \u0a28\u0a3f\u0a0a\u0a1c\u0a3c \u0a28\u0a3e\u0a30\u0a26 | \u0a09\u0a71\u0a24\u0a30 \u0a2d\u0a3e\u0a30\u0a24 \u0a26\u0a40\u0a06\u0a02 \u0a24\u0a3e\u0a1c\u0a3c\u0a3e \u0a16\u0a3c\u0a2c\u0a30\u0a3e\u0a02 \u0a1c\u0a3f\u0a28\u0a4d\u0a39\u0a3e\u0a02 \u0a35\u0a3f\u0a71\u0a1a \u0a2a\u0a70\u0a1c\u0a3e\u0a2c, \u0a39\u0a30\u0a3f\u0a06\u0a23\u0a3e, \u0a39\u0a3f\u0a2e\u0a3e\u0a1a\u0a32 \u0a2a\u0a4d\u0a30\u0a26\u0a47\u0a38\u0a3c, \u0a2f\u0a42\u0a2a\u0a40, \u0a2c\u0a3f\u0a39\u0a3e\u0a30, \u0a1c\u0a70\u0a2e\u0a42 \u0a15\u0a38\u0a3c\u0a2e\u0a40\u0a30 \u0a30\u0a3e\u0a1c\u0a38\u0a25\u0a3e\u0a28, \u0a09\u0a71\u0a24\u0a30\u0a3e\u0a16\u0a70\u0a21, \u0a1a\u0a70\u0a21\u0a40\u0a17\u0a5c\u0a4d\u0a39, \u0a26\u0a3f\u0a71\u0a32\u0a40 \u0a10\u0a28\u0a38\u0a40\u0a06\u0a30 \u0a06\u0a26\u0a3f \u0a38\u0a3c\u0a3e\u0a2e\u0a32 \u0a39\u0a28","og:type":"article","og:title":"SJVN commissions 50 MW Gujrai Solar Power Station in Uttar Pradesh - News Narad | \u0a28\u0a3f\u0a0a\u0a1c\u0a3c \u0a28\u0a3e\u0a30\u0a26 | \u0a09\u0a71\u0a24\u0a30 \u0a2d\u0a3e\u0a30\u0a24 \u0a26\u0a40\u0a06\u0a02 \u0a24\u0a3e\u0a1c\u0a3c\u0a3e \u0a16\u0a3c\u0a2c\u0a30\u0a3e\u0a02","og:description":"\u0a2e\u0a3e\u0a2b\u0a3c \u0a15\u0a30\u0a28\u0a3e, \u0a07\u0a39 \u0a16\u0a2c\u0a30 \u0a24\u0a41\u0a39\u0a3e\u0a21\u0a40 \u0a2c\u0a47\u0a28\u0a24\u0a40 \u0a2d\u0a3e\u0a38\u0a3c\u0a3e \u0a35\u0a3f\u0a71\u0a1a \u0a09\u0a2a\u0a32\u0a2c\u0a27 \u0a28\u0a39\u0a40\u0a02 \u0a39\u0a48\u0964 \u0a15\u0a3f\u0a30\u0a2a\u0a3e \u0a15\u0a30\u0a15\u0a47 \u0a07\u0a71\u0a25\u0a47 \u0a26\u0a47\u0a16\u0a4b\u0964Delhi, 23 FEB 2024 SJVN Limited, a Mini Ratna, Category-I and Schedule \u2018A\u2019 Central public sector enterprise under the administrative control of Ministry of Power, Government of India, has begun the successful commercial operation of its 50 MW Gujrai Solar Power Station","og:url":"https:\/\/newsnarad.com\/pa\/sjvn-commissions-50-mw-gujrai-solar-power-station-in-uttar-pradesh\/","article:published_time":"2024-02-23T11:33:42+00:00","article:modified_time":"2024-02-24T03:54:45+00:00","twitter:card":"summary_large_image","twitter:title":"SJVN commissions 50 MW Gujrai Solar Power Station in Uttar Pradesh - News Narad | \u0a28\u0a3f\u0a0a\u0a1c\u0a3c \u0a28\u0a3e\u0a30\u0a26 | \u0a09\u0a71\u0a24\u0a30 \u0a2d\u0a3e\u0a30\u0a24 \u0a26\u0a40\u0a06\u0a02 \u0a24\u0a3e\u0a1c\u0a3c\u0a3e \u0a16\u0a3c\u0a2c\u0a30\u0a3e\u0a02","twitter:description":"\u0a2e\u0a3e\u0a2b\u0a3c \u0a15\u0a30\u0a28\u0a3e, \u0a07\u0a39 \u0a16\u0a2c\u0a30 \u0a24\u0a41\u0a39\u0a3e\u0a21\u0a40 \u0a2c\u0a47\u0a28\u0a24\u0a40 \u0a2d\u0a3e\u0a38\u0a3c\u0a3e \u0a35\u0a3f\u0a71\u0a1a \u0a09\u0a2a\u0a32\u0a2c\u0a27 \u0a28\u0a39\u0a40\u0a02 \u0a39\u0a48\u0964 \u0a15\u0a3f\u0a30\u0a2a\u0a3e \u0a15\u0a30\u0a15\u0a47 \u0a07\u0a71\u0a25\u0a47 \u0a26\u0a47\u0a16\u0a4b\u0964Delhi, 23 FEB 2024 SJVN Limited, a Mini Ratna, Category-I and Schedule \u2018A\u2019 Central public sector enterprise under the administrative control of Ministry of Power, Government of India, has begun the successful commercial operation of its 50 MW Gujrai Solar Power Station"},"aioseo_meta_data":{"post_id":"197608","title":null,"description":null,"keywords":null,"keyphrases":null,"primary_term":null,"canonical_url":null,"og_title":null,"og_description":null,"og_object_type":"default","og_image_type":"default","og_image_url":null,"og_image_width":null,"og_image_height":null,"og_image_custom_url":null,"og_image_custom_fields":null,"og_video":null,"og_custom_url":null,"og_article_section":null,"og_article_tags":null,"twitter_use_og":false,"twitter_card":"default","twitter_image_type":"default","twitter_image_url":null,"twitter_image_custom_url":null,"twitter_image_custom_fields":null,"twitter_title":null,"twitter_description":null,"schema":{"blockGraphs":[],"customGraphs":[],"default":{"data":{"Article":[],"Course":[],"Dataset":[],"FAQPage":[],"Movie":[],"Person":[],"Product":[],"ProductReview":[],"Car":[],"Recipe":[],"Service":[],"SoftwareApplication":[],"WebPage":[]},"graphName":"","isEnabled":true},"graphs":[]},"schema_type":"default","schema_type_options":null,"pillar_content":false,"robots_default":true,"robots_noindex":false,"robots_noarchive":false,"robots_nosnippet":false,"robots_nofollow":false,"robots_noimageindex":false,"robots_noodp":false,"robots_notranslate":false,"robots_max_snippet":null,"robots_max_videopreview":null,"robots_max_imagepreview":"large","priority":null,"frequency":null,"local_seo":null,"breadcrumb_settings":null,"limit_modified_date":false,"ai":null,"created":"2025-03-15 16:19:43","updated":"2025-06-11 12:11:39","seo_analyzer_scan_date":null,"focus_keyword":null,"additional_keywords":null,"truseo_locale":null},"aioseo_breadcrumb":"<div class=\"aioseo-breadcrumbs\"><span class=\"aioseo-breadcrumb\">\n\t\t\t<a href=\"https:\/\/newsnarad.com\/pa\/\" title=\"Home\">Home<\/a>\n\t\t<\/span><span class=\"aioseo-breadcrumb-separator\">\u00bb<\/span><span class=\"aioseo-breadcrumb\">\n\t\t\t<a href=\"https:\/\/newsnarad.com\/pa\/category\/national\/\" title=\"\u0a30\u0a3e\u0a38\u0a3c\u0a1f\u0a30\u0a40\">\u0a30\u0a3e\u0a38\u0a3c\u0a1f\u0a30\u0a40<\/a>\n\t\t<\/span><span class=\"aioseo-breadcrumb-separator\">\u00bb<\/span><span class=\"aioseo-breadcrumb\">\n\t\t\tSJVN commissions 50 MW Gujrai Solar Power Station in Uttar Pradesh\n\t\t<\/span><\/div>","aioseo_breadcrumb_json":[{"label":"Home","link":"https:\/\/newsnarad.com\/pa\/"},{"label":"\u0a30\u0a3e\u0a38\u0a3c\u0a1f\u0a30\u0a40","link":"https:\/\/newsnarad.com\/pa\/category\/national\/"},{"label":"SJVN commissions 50 MW Gujrai Solar Power Station in Uttar Pradesh","link":"https:\/\/newsnarad.com\/pa\/sjvn-commissions-50-mw-gujrai-solar-power-station-in-uttar-pradesh\/"}],"_links":{"self":[{"href":"https:\/\/newsnarad.com\/pa\/wp-json\/wp\/v2\/posts\/197608","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/newsnarad.com\/pa\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/newsnarad.com\/pa\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/newsnarad.com\/pa\/wp-json\/wp\/v2\/users\/17"}],"replies":[{"embeddable":true,"href":"https:\/\/newsnarad.com\/pa\/wp-json\/wp\/v2\/comments?post=197608"}],"version-history":[{"count":0,"href":"https:\/\/newsnarad.com\/pa\/wp-json\/wp\/v2\/posts\/197608\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/newsnarad.com\/pa\/wp-json\/wp\/v2\/media\/197609"}],"wp:attachment":[{"href":"https:\/\/newsnarad.com\/pa\/wp-json\/wp\/v2\/media?parent=197608"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/newsnarad.com\/pa\/wp-json\/wp\/v2\/categories?post=197608"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/newsnarad.com\/pa\/wp-json\/wp\/v2\/tags?post=197608"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}