{"id":78420,"date":"2021-07-02T15:21:44","date_gmt":"2021-07-02T09:51:44","guid":{"rendered":"https:\/\/newsmakhani.com\/?p=78420"},"modified":"2021-07-05T15:25:04","modified_gmt":"2021-07-05T09:55:04","slug":"lreda-replaces-battery-of-solar-power-plants-at-lukung-spangmik","status":"publish","type":"post","link":"https:\/\/newsnarad.com\/pa\/lreda-replaces-battery-of-solar-power-plants-at-lukung-spangmik\/","title":{"rendered":"LREDA replaces battery of solar power plants at Lukung, Spangmik"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-pa\">\u0a2e\u0a3e\u0a2b\u0a3c \u0a15\u0a30\u0a28\u0a3e, \u0a07\u0a39 \u0a16\u0a2c\u0a30 \u0a24\u0a41\u0a39\u0a3e\u0a21\u0a40 \u0a2c\u0a47\u0a28\u0a24\u0a40 \u0a2d\u0a3e\u0a38\u0a3c\u0a3e \u0a35\u0a3f\u0a71\u0a1a \u0a09\u0a2a\u0a32\u0a2c\u0a27 \u0a28\u0a39\u0a40\u0a02 \u0a39\u0a48\u0964 <a href=\"https:\/\/newsmakhani.com\/en\/\">\u0a15\u0a3f\u0a30\u0a2a\u0a3e \u0a15\u0a30\u0a15\u0a47 \u0a07\u0a71\u0a25\u0a47 \u0a26\u0a47\u0a16\u0a4b\u0964<\/a><\/p><p><strong>Leh, July 2 2021<\/strong> LREDA successfully placed a new battery bank set at the Solar Power Plant in Lukung and Spangmik under the Battery Replacement Scheme of solar power plants under the Special Development Package after being directed by Secretary, PDD, Ravinder Kumar.<br \/>\nThe off-grid solar power plant was installed under the Ladakh Renewable Initiative Scheme of Ladakh Project 2010. Around 20 sites have been proposed for replacing Solar Power Plants batteries at a budget of Rs 5.3 crores under the Special Development Package in the current financial year 21-22.<br \/>\nThe work at the remaining 18 sites is currently in progress and would be completed in the next two months. Replacing battery banks was proposed for areas where grid connectivity is not available<\/p>","protected":false},"excerpt":{"rendered":"<p>\u0a2e\u0a3e\u0a2b\u0a3c \u0a15\u0a30\u0a28\u0a3e, \u0a07\u0a39 \u0a16\u0a2c\u0a30 \u0a24\u0a41\u0a39\u0a3e\u0a21\u0a40 \u0a2c\u0a47\u0a28\u0a24\u0a40 \u0a2d\u0a3e\u0a38\u0a3c\u0a3e \u0a35\u0a3f\u0a71\u0a1a \u0a09\u0a2a\u0a32\u0a2c\u0a27 \u0a28\u0a39\u0a40\u0a02 \u0a39\u0a48\u0964 \u0a15\u0a3f\u0a30\u0a2a\u0a3e \u0a15\u0a30\u0a15\u0a47 \u0a07\u0a71\u0a25\u0a47 \u0a26\u0a47\u0a16\u0a4b\u0964Leh, July 2 2021 LREDA successfully placed a new battery bank set at the Solar Power Plant in Lukung and Spangmik under the Battery Replacement Scheme of solar power plants under the Special Development Package after being directed by Secretary, PDD, [&hellip;]<\/p>\n","protected":false},"author":14,"featured_media":78422,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[3021],"tags":[42627,42628,39470,34435,1216,42626,42629],"class_list":["post-78420","post","type-post","status-publish","format-standard","has-post-thumbnail","category-leh","tag-battery-replacement-scheme","tag-lukung","tag-pdd","tag-ravinder-kumar","tag-secretary","tag-spangmik"],"aioseo_notices":[],"aioseo_head":"\n\t\t<!-- All in One SEO 5.0.3 - aioseo.com -->\n\t<meta name=\"description\" content=\"\u0a2e\u0a3e\u0a2b\u0a3c \u0a15\u0a30\u0a28\u0a3e, \u0a07\u0a39 \u0a16\u0a2c\u0a30 \u0a24\u0a41\u0a39\u0a3e\u0a21\u0a40 \u0a2c\u0a47\u0a28\u0a24\u0a40 \u0a2d\u0a3e\u0a38\u0a3c\u0a3e \u0a35\u0a3f\u0a71\u0a1a \u0a09\u0a2a\u0a32\u0a2c\u0a27 \u0a28\u0a39\u0a40\u0a02 \u0a39\u0a48\u0964 \u0a15\u0a3f\u0a30\u0a2a\u0a3e \u0a15\u0a30\u0a15\u0a47 \u0a07\u0a71\u0a25\u0a47 \u0a26\u0a47\u0a16\u0a4b\u0964Leh, July 2 2021 LREDA successfully placed a new battery bank set at the Solar Power Plant in Lukung and Spangmik under the Battery Replacement Scheme of solar power plants under the Special Development Package after being directed by Secretary, PDD,\" \/>\n\t<meta name=\"robots\" content=\"max-image-preview:large\" \/>\n\t<meta name=\"author\" content=\"Akash Kumar\"\/>\n\t<link rel=\"canonical\" href=\"https:\/\/newsnarad.com\/pa\/lreda-replaces-battery-of-solar-power-plants-at-lukung-spangmik\/\" \/>\n\t\t<meta name=\"generator\" content=\"All in One SEO (AIOSEO) 5.0.3\" \/>\n\t\t<meta property=\"og:locale\" content=\"pa_IN\" \/>\n\t\t<meta property=\"og:site_name\" content=\"News Narad | \u0a28\u0a3f\u0a0a\u0a1c\u0a3c \u0a28\u0a3e\u0a30\u0a26 | \u0a09\u0a71\u0a24\u0a30 \u0a2d\u0a3e\u0a30\u0a24 \u0a26\u0a40\u0a06\u0a02 \u0a24\u0a3e\u0a1c\u0a3c\u0a3e \u0a16\u0a3c\u0a2c\u0a30\u0a3e\u0a02 - \u0a28\u0a3f\u0a0a\u0a1c\u0a3c \u0a28\u0a3e\u0a30\u0a26 | \u0a09\u0a71\u0a24\u0a30 \u0a2d\u0a3e\u0a30\u0a24 \u0a26\u0a40\u0a06\u0a02 \u0a24\u0a3e\u0a1c\u0a3c\u0a3e \u0a16\u0a3c\u0a2c\u0a30\u0a3e\u0a02 \u0a1c\u0a3f\u0a28\u0a4d\u0a39\u0a3e\u0a02 \u0a35\u0a3f\u0a71\u0a1a \u0a2a\u0a70\u0a1c\u0a3e\u0a2c, \u0a39\u0a30\u0a3f\u0a06\u0a23\u0a3e, \u0a39\u0a3f\u0a2e\u0a3e\u0a1a\u0a32 \u0a2a\u0a4d\u0a30\u0a26\u0a47\u0a38\u0a3c, \u0a2f\u0a42\u0a2a\u0a40, \u0a2c\u0a3f\u0a39\u0a3e\u0a30, \u0a1c\u0a70\u0a2e\u0a42 \u0a15\u0a38\u0a3c\u0a2e\u0a40\u0a30 \u0a30\u0a3e\u0a1c\u0a38\u0a25\u0a3e\u0a28, \u0a09\u0a71\u0a24\u0a30\u0a3e\u0a16\u0a70\u0a21, \u0a1a\u0a70\u0a21\u0a40\u0a17\u0a5c\u0a4d\u0a39, \u0a26\u0a3f\u0a71\u0a32\u0a40 \u0a10\u0a28\u0a38\u0a40\u0a06\u0a30 \u0a06\u0a26\u0a3f \u0a38\u0a3c\u0a3e\u0a2e\u0a32 \u0a39\u0a28\" \/>\n\t\t<meta property=\"og:type\" content=\"article\" \/>\n\t\t<meta property=\"og:title\" content=\"LREDA replaces battery of solar power plants at Lukung, Spangmik - News Narad | \u0a28\u0a3f\u0a0a\u0a1c\u0a3c \u0a28\u0a3e\u0a30\u0a26 | \u0a09\u0a71\u0a24\u0a30 \u0a2d\u0a3e\u0a30\u0a24 \u0a26\u0a40\u0a06\u0a02 \u0a24\u0a3e\u0a1c\u0a3c\u0a3e \u0a16\u0a3c\u0a2c\u0a30\u0a3e\u0a02\" \/>\n\t\t<meta property=\"og:description\" content=\"\u0a2e\u0a3e\u0a2b\u0a3c \u0a15\u0a30\u0a28\u0a3e, \u0a07\u0a39 \u0a16\u0a2c\u0a30 \u0a24\u0a41\u0a39\u0a3e\u0a21\u0a40 \u0a2c\u0a47\u0a28\u0a24\u0a40 \u0a2d\u0a3e\u0a38\u0a3c\u0a3e \u0a35\u0a3f\u0a71\u0a1a \u0a09\u0a2a\u0a32\u0a2c\u0a27 \u0a28\u0a39\u0a40\u0a02 \u0a39\u0a48\u0964 \u0a15\u0a3f\u0a30\u0a2a\u0a3e \u0a15\u0a30\u0a15\u0a47 \u0a07\u0a71\u0a25\u0a47 \u0a26\u0a47\u0a16\u0a4b\u0964Leh, July 2 2021 LREDA successfully placed a new battery bank set at the Solar Power Plant in Lukung and Spangmik under the Battery Replacement Scheme of solar power plants under the Special Development Package after being directed by Secretary, PDD,\" \/>\n\t\t<meta property=\"og:url\" content=\"https:\/\/newsnarad.com\/pa\/lreda-replaces-battery-of-solar-power-plants-at-lukung-spangmik\/\" \/>\n\t\t<meta property=\"article:published_time\" content=\"2021-07-02T09:51:44+00:00\" \/>\n\t\t<meta property=\"article:modified_time\" content=\"2021-07-05T09:55:04+00:00\" \/>\n\t\t<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n\t\t<meta name=\"twitter:title\" content=\"LREDA replaces battery of solar power plants at Lukung, Spangmik - News Narad | \u0a28\u0a3f\u0a0a\u0a1c\u0a3c \u0a28\u0a3e\u0a30\u0a26 | \u0a09\u0a71\u0a24\u0a30 \u0a2d\u0a3e\u0a30\u0a24 \u0a26\u0a40\u0a06\u0a02 \u0a24\u0a3e\u0a1c\u0a3c\u0a3e \u0a16\u0a3c\u0a2c\u0a30\u0a3e\u0a02\" \/>\n\t\t<meta name=\"twitter:description\" content=\"\u0a2e\u0a3e\u0a2b\u0a3c \u0a15\u0a30\u0a28\u0a3e, \u0a07\u0a39 \u0a16\u0a2c\u0a30 \u0a24\u0a41\u0a39\u0a3e\u0a21\u0a40 \u0a2c\u0a47\u0a28\u0a24\u0a40 \u0a2d\u0a3e\u0a38\u0a3c\u0a3e \u0a35\u0a3f\u0a71\u0a1a \u0a09\u0a2a\u0a32\u0a2c\u0a27 \u0a28\u0a39\u0a40\u0a02 \u0a39\u0a48\u0964 \u0a15\u0a3f\u0a30\u0a2a\u0a3e \u0a15\u0a30\u0a15\u0a47 \u0a07\u0a71\u0a25\u0a47 \u0a26\u0a47\u0a16\u0a4b\u0964Leh, July 2 2021 LREDA successfully placed a new battery bank set at the Solar Power Plant in Lukung and Spangmik under the Battery Replacement Scheme of solar power plants under the Special Development Package after being directed by Secretary, PDD,\" \/>\n\t\t<script type=\"application\/ld+json\" class=\"aioseo-schema\">\n\t\t\t{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"BlogPosting\",\"@id\":\"https:\\\/\\\/newsnarad.com\\\/pa\\\/lreda-replaces-battery-of-solar-power-plants-at-lukung-spangmik\\\/#blogposting\",\"name\":\"LREDA replaces battery of solar power plants at Lukung, Spangmik - News Narad | \\u0a28\\u0a3f\\u0a0a\\u0a1c\\u0a3c \\u0a28\\u0a3e\\u0a30\\u0a26 | \\u0a09\\u0a71\\u0a24\\u0a30 \\u0a2d\\u0a3e\\u0a30\\u0a24 \\u0a26\\u0a40\\u0a06\\u0a02 \\u0a24\\u0a3e\\u0a1c\\u0a3c\\u0a3e \\u0a16\\u0a3c\\u0a2c\\u0a30\\u0a3e\\u0a02\",\"headline\":\"LREDA replaces battery of solar power plants at Lukung, Spangmik\",\"author\":{\"@id\":\"https:\\\/\\\/newsnarad.com\\\/pa\\\/author\\\/akashkumarnm\\\/#author\"},\"publisher\":{\"@id\":\"https:\\\/\\\/newsnarad.com\\\/pa\\\/#organization\"},\"image\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/newsnarad.com\\\/wp-content\\\/uploads\\\/2021\\\/07\\\/Untitled-design-2021-07-05T152441.624.jpg\",\"width\":1280,\"height\":720},\"datePublished\":\"2021-07-02T15:21:44+05:30\",\"dateModified\":\"2021-07-05T15:25:04+05:30\",\"inLanguage\":\"pa-IN\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/newsnarad.com\\\/pa\\\/lreda-replaces-battery-of-solar-power-plants-at-lukung-spangmik\\\/#webpage\"},\"isPartOf\":{\"@id\":\"https:\\\/\\\/newsnarad.com\\\/pa\\\/lreda-replaces-battery-of-solar-power-plants-at-lukung-spangmik\\\/#webpage\"},\"articleSection\":\"\\u0a32\\u0a47\\u0a39, Battery Replacement Scheme, Lukung, PDD, Ravinder Kumar, Secretary, Solar Power Plant, Spangmik\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/newsnarad.com\\\/pa\\\/lreda-replaces-battery-of-solar-power-plants-at-lukung-spangmik\\\/#breadcrumblist\",\"itemListElement\":[{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/newsnarad.com\\\/pa\\\/#listItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/newsnarad.com\\\/pa\\\/\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/newsnarad.com\\\/pa\\\/category\\\/ladakh\\\/#listItem\",\"name\":\"\\u0a32\\u0a71\\u0a26\\u0a3e\\u0a16\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/newsnarad.com\\\/pa\\\/category\\\/ladakh\\\/#listItem\",\"position\":2,\"name\":\"\\u0a32\\u0a71\\u0a26\\u0a3e\\u0a16\",\"item\":\"https:\\\/\\\/newsnarad.com\\\/pa\\\/category\\\/ladakh\\\/\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/newsnarad.com\\\/pa\\\/category\\\/ladakh\\\/leh\\\/#listItem\",\"name\":\"\\u0a32\\u0a47\\u0a39\"},\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/newsnarad.com\\\/pa\\\/#listItem\",\"name\":\"Home\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/newsnarad.com\\\/pa\\\/category\\\/ladakh\\\/leh\\\/#listItem\",\"position\":3,\"name\":\"\\u0a32\\u0a47\\u0a39\",\"item\":\"https:\\\/\\\/newsnarad.com\\\/pa\\\/category\\\/ladakh\\\/leh\\\/\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/newsnarad.com\\\/pa\\\/lreda-replaces-battery-of-solar-power-plants-at-lukung-spangmik\\\/#listItem\",\"name\":\"LREDA replaces battery of solar power plants at Lukung, Spangmik\"},\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/newsnarad.com\\\/pa\\\/category\\\/ladakh\\\/#listItem\",\"name\":\"\\u0a32\\u0a71\\u0a26\\u0a3e\\u0a16\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/newsnarad.com\\\/pa\\\/lreda-replaces-battery-of-solar-power-plants-at-lukung-spangmik\\\/#listItem\",\"position\":4,\"name\":\"LREDA replaces battery of solar power plants at Lukung, Spangmik\",\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/newsnarad.com\\\/pa\\\/category\\\/ladakh\\\/leh\\\/#listItem\",\"name\":\"\\u0a32\\u0a47\\u0a39\"}}]},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/newsnarad.com\\\/pa\\\/#organization\",\"name\":\"News Narad | \\u0a28\\u0a3f\\u0a0a\\u0a1c\\u0a3c \\u0a28\\u0a3e\\u0a30\\u0a26 | \\u0a09\\u0a71\\u0a24\\u0a30 \\u0a2d\\u0a3e\\u0a30\\u0a24 \\u0a26\\u0a40\\u0a06\\u0a02 \\u0a24\\u0a3e\\u0a1c\\u0a3c\\u0a3e \\u0a16\\u0a3c\\u0a2c\\u0a30\\u0a3e\\u0a02\",\"description\":\"\\u0a28\\u0a3f\\u0a0a\\u0a1c\\u0a3c \\u0a28\\u0a3e\\u0a30\\u0a26 | \\u0a09\\u0a71\\u0a24\\u0a30 \\u0a2d\\u0a3e\\u0a30\\u0a24 \\u0a26\\u0a40\\u0a06\\u0a02 \\u0a24\\u0a3e\\u0a1c\\u0a3c\\u0a3e \\u0a16\\u0a3c\\u0a2c\\u0a30\\u0a3e\\u0a02 \\u0a1c\\u0a3f\\u0a28\\u0a4d\\u0a39\\u0a3e\\u0a02 \\u0a35\\u0a3f\\u0a71\\u0a1a \\u0a2a\\u0a70\\u0a1c\\u0a3e\\u0a2c, \\u0a39\\u0a30\\u0a3f\\u0a06\\u0a23\\u0a3e, \\u0a39\\u0a3f\\u0a2e\\u0a3e\\u0a1a\\u0a32 \\u0a2a\\u0a4d\\u0a30\\u0a26\\u0a47\\u0a38\\u0a3c, \\u0a2f\\u0a42\\u0a2a\\u0a40, \\u0a2c\\u0a3f\\u0a39\\u0a3e\\u0a30, \\u0a1c\\u0a70\\u0a2e\\u0a42 \\u0a15\\u0a38\\u0a3c\\u0a2e\\u0a40\\u0a30 \\u0a30\\u0a3e\\u0a1c\\u0a38\\u0a25\\u0a3e\\u0a28, \\u0a09\\u0a71\\u0a24\\u0a30\\u0a3e\\u0a16\\u0a70\\u0a21, \\u0a1a\\u0a70\\u0a21\\u0a40\\u0a17\\u0a5c\\u0a4d\\u0a39, \\u0a26\\u0a3f\\u0a71\\u0a32\\u0a40 \\u0a10\\u0a28\\u0a38\\u0a40\\u0a06\\u0a30 \\u0a06\\u0a26\\u0a3f \\u0a38\\u0a3c\\u0a3e\\u0a2e\\u0a32 \\u0a39\\u0a28\",\"url\":\"https:\\\/\\\/newsnarad.com\\\/pa\\\/\"},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/newsnarad.com\\\/pa\\\/author\\\/akashkumarnm\\\/#author\",\"url\":\"https:\\\/\\\/newsnarad.com\\\/pa\\\/author\\\/akashkumarnm\\\/\",\"name\":\"Akash Kumar\",\"image\":{\"@type\":\"ImageObject\",\"@id\":\"https:\\\/\\\/newsnarad.com\\\/pa\\\/lreda-replaces-battery-of-solar-power-plants-at-lukung-spangmik\\\/#authorImage\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/8fd96d9f44fb09010c9e10585f35b22db3480b9425d2f311f1e25dc1f861bf9d?s=96&d=mm&r=g\",\"width\":96,\"height\":96,\"caption\":\"Akash Kumar\"}},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/newsnarad.com\\\/pa\\\/lreda-replaces-battery-of-solar-power-plants-at-lukung-spangmik\\\/#webpage\",\"url\":\"https:\\\/\\\/newsnarad.com\\\/pa\\\/lreda-replaces-battery-of-solar-power-plants-at-lukung-spangmik\\\/\",\"name\":\"LREDA replaces battery of solar power plants at Lukung, Spangmik - News Narad | \\u0a28\\u0a3f\\u0a0a\\u0a1c\\u0a3c \\u0a28\\u0a3e\\u0a30\\u0a26 | \\u0a09\\u0a71\\u0a24\\u0a30 \\u0a2d\\u0a3e\\u0a30\\u0a24 \\u0a26\\u0a40\\u0a06\\u0a02 \\u0a24\\u0a3e\\u0a1c\\u0a3c\\u0a3e \\u0a16\\u0a3c\\u0a2c\\u0a30\\u0a3e\\u0a02\",\"description\":\"\\u0a2e\\u0a3e\\u0a2b\\u0a3c \\u0a15\\u0a30\\u0a28\\u0a3e, \\u0a07\\u0a39 \\u0a16\\u0a2c\\u0a30 \\u0a24\\u0a41\\u0a39\\u0a3e\\u0a21\\u0a40 \\u0a2c\\u0a47\\u0a28\\u0a24\\u0a40 \\u0a2d\\u0a3e\\u0a38\\u0a3c\\u0a3e \\u0a35\\u0a3f\\u0a71\\u0a1a \\u0a09\\u0a2a\\u0a32\\u0a2c\\u0a27 \\u0a28\\u0a39\\u0a40\\u0a02 \\u0a39\\u0a48\\u0964 \\u0a15\\u0a3f\\u0a30\\u0a2a\\u0a3e \\u0a15\\u0a30\\u0a15\\u0a47 \\u0a07\\u0a71\\u0a25\\u0a47 \\u0a26\\u0a47\\u0a16\\u0a4b\\u0964Leh, July 2 2021 LREDA successfully placed a new battery bank set at the Solar Power Plant in Lukung and Spangmik under the Battery Replacement Scheme of solar power plants under the Special Development Package after being directed by Secretary, PDD,\",\"inLanguage\":\"pa-IN\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/newsnarad.com\\\/pa\\\/#website\"},\"breadcrumb\":{\"@id\":\"https:\\\/\\\/newsnarad.com\\\/pa\\\/lreda-replaces-battery-of-solar-power-plants-at-lukung-spangmik\\\/#breadcrumblist\"},\"author\":{\"@id\":\"https:\\\/\\\/newsnarad.com\\\/pa\\\/author\\\/akashkumarnm\\\/#author\"},\"creator\":{\"@id\":\"https:\\\/\\\/newsnarad.com\\\/pa\\\/author\\\/akashkumarnm\\\/#author\"},\"image\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/newsnarad.com\\\/wp-content\\\/uploads\\\/2021\\\/07\\\/Untitled-design-2021-07-05T152441.624.jpg\",\"@id\":\"https:\\\/\\\/newsnarad.com\\\/pa\\\/lreda-replaces-battery-of-solar-power-plants-at-lukung-spangmik\\\/#mainImage\",\"width\":1280,\"height\":720},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/newsnarad.com\\\/pa\\\/lreda-replaces-battery-of-solar-power-plants-at-lukung-spangmik\\\/#mainImage\"},\"datePublished\":\"2021-07-02T15:21:44+05:30\",\"dateModified\":\"2021-07-05T15:25:04+05:30\"},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/newsnarad.com\\\/pa\\\/#website\",\"url\":\"https:\\\/\\\/newsnarad.com\\\/pa\\\/\",\"name\":\"News Narad | \\u0a28\\u0a3f\\u0a0a\\u0a1c\\u0a3c \\u0a28\\u0a3e\\u0a30\\u0a26 | \\u0a09\\u0a71\\u0a24\\u0a30 \\u0a2d\\u0a3e\\u0a30\\u0a24 \\u0a26\\u0a40\\u0a06\\u0a02 \\u0a24\\u0a3e\\u0a1c\\u0a3c\\u0a3e \\u0a16\\u0a3c\\u0a2c\\u0a30\\u0a3e\\u0a02\",\"description\":\"\\u0a28\\u0a3f\\u0a0a\\u0a1c\\u0a3c \\u0a28\\u0a3e\\u0a30\\u0a26 | \\u0a09\\u0a71\\u0a24\\u0a30 \\u0a2d\\u0a3e\\u0a30\\u0a24 \\u0a26\\u0a40\\u0a06\\u0a02 \\u0a24\\u0a3e\\u0a1c\\u0a3c\\u0a3e \\u0a16\\u0a3c\\u0a2c\\u0a30\\u0a3e\\u0a02 \\u0a1c\\u0a3f\\u0a28\\u0a4d\\u0a39\\u0a3e\\u0a02 \\u0a35\\u0a3f\\u0a71\\u0a1a \\u0a2a\\u0a70\\u0a1c\\u0a3e\\u0a2c, \\u0a39\\u0a30\\u0a3f\\u0a06\\u0a23\\u0a3e, \\u0a39\\u0a3f\\u0a2e\\u0a3e\\u0a1a\\u0a32 \\u0a2a\\u0a4d\\u0a30\\u0a26\\u0a47\\u0a38\\u0a3c, \\u0a2f\\u0a42\\u0a2a\\u0a40, \\u0a2c\\u0a3f\\u0a39\\u0a3e\\u0a30, \\u0a1c\\u0a70\\u0a2e\\u0a42 \\u0a15\\u0a38\\u0a3c\\u0a2e\\u0a40\\u0a30 \\u0a30\\u0a3e\\u0a1c\\u0a38\\u0a25\\u0a3e\\u0a28, \\u0a09\\u0a71\\u0a24\\u0a30\\u0a3e\\u0a16\\u0a70\\u0a21, \\u0a1a\\u0a70\\u0a21\\u0a40\\u0a17\\u0a5c\\u0a4d\\u0a39, \\u0a26\\u0a3f\\u0a71\\u0a32\\u0a40 \\u0a10\\u0a28\\u0a38\\u0a40\\u0a06\\u0a30 \\u0a06\\u0a26\\u0a3f \\u0a38\\u0a3c\\u0a3e\\u0a2e\\u0a32 \\u0a39\\u0a28\",\"inLanguage\":\"pa-IN\",\"publisher\":{\"@id\":\"https:\\\/\\\/newsnarad.com\\\/pa\\\/#organization\"}}]}\n\t\t<\/script>\n\t\t<!-- All in One SEO -->\n\n","aioseo_head_json":{"title":"LREDA replaces battery of solar power plants at Lukung, Spangmik - News Narad | \u0a28\u0a3f\u0a0a\u0a1c\u0a3c \u0a28\u0a3e\u0a30\u0a26 | \u0a09\u0a71\u0a24\u0a30 \u0a2d\u0a3e\u0a30\u0a24 \u0a26\u0a40\u0a06\u0a02 \u0a24\u0a3e\u0a1c\u0a3c\u0a3e \u0a16\u0a3c\u0a2c\u0a30\u0a3e\u0a02","description":"\u0a2e\u0a3e\u0a2b\u0a3c \u0a15\u0a30\u0a28\u0a3e, \u0a07\u0a39 \u0a16\u0a2c\u0a30 \u0a24\u0a41\u0a39\u0a3e\u0a21\u0a40 \u0a2c\u0a47\u0a28\u0a24\u0a40 \u0a2d\u0a3e\u0a38\u0a3c\u0a3e \u0a35\u0a3f\u0a71\u0a1a \u0a09\u0a2a\u0a32\u0a2c\u0a27 \u0a28\u0a39\u0a40\u0a02 \u0a39\u0a48\u0964 \u0a15\u0a3f\u0a30\u0a2a\u0a3e \u0a15\u0a30\u0a15\u0a47 \u0a07\u0a71\u0a25\u0a47 \u0a26\u0a47\u0a16\u0a4b\u0964Leh, July 2 2021 LREDA successfully placed a new battery bank set at the Solar Power Plant in Lukung and Spangmik under the Battery Replacement Scheme of solar power plants under the Special Development Package after being directed by Secretary, PDD,","canonical_url":"https:\/\/newsnarad.com\/pa\/lreda-replaces-battery-of-solar-power-plants-at-lukung-spangmik\/","robots":"max-image-preview:large","keywords":"","webmasterTools":{"miscellaneous":""},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"BlogPosting","@id":"https:\/\/newsnarad.com\/pa\/lreda-replaces-battery-of-solar-power-plants-at-lukung-spangmik\/#blogposting","name":"LREDA replaces battery of solar power plants at Lukung, Spangmik - News Narad | \u0a28\u0a3f\u0a0a\u0a1c\u0a3c \u0a28\u0a3e\u0a30\u0a26 | \u0a09\u0a71\u0a24\u0a30 \u0a2d\u0a3e\u0a30\u0a24 \u0a26\u0a40\u0a06\u0a02 \u0a24\u0a3e\u0a1c\u0a3c\u0a3e \u0a16\u0a3c\u0a2c\u0a30\u0a3e\u0a02","headline":"LREDA replaces battery of solar power plants at Lukung, Spangmik","author":{"@id":"https:\/\/newsnarad.com\/pa\/author\/akashkumarnm\/#author"},"publisher":{"@id":"https:\/\/newsnarad.com\/pa\/#organization"},"image":{"@type":"ImageObject","url":"https:\/\/newsnarad.com\/wp-content\/uploads\/2021\/07\/Untitled-design-2021-07-05T152441.624.jpg","width":1280,"height":720},"datePublished":"2021-07-02T15:21:44+05:30","dateModified":"2021-07-05T15:25:04+05:30","inLanguage":"pa-IN","mainEntityOfPage":{"@id":"https:\/\/newsnarad.com\/pa\/lreda-replaces-battery-of-solar-power-plants-at-lukung-spangmik\/#webpage"},"isPartOf":{"@id":"https:\/\/newsnarad.com\/pa\/lreda-replaces-battery-of-solar-power-plants-at-lukung-spangmik\/#webpage"},"articleSection":"\u0a32\u0a47\u0a39, Battery Replacement Scheme, Lukung, PDD, Ravinder Kumar, Secretary, Solar Power Plant, Spangmik"},{"@type":"BreadcrumbList","@id":"https:\/\/newsnarad.com\/pa\/lreda-replaces-battery-of-solar-power-plants-at-lukung-spangmik\/#breadcrumblist","itemListElement":[{"@type":"ListItem","@id":"https:\/\/newsnarad.com\/pa\/#listItem","position":1,"name":"Home","item":"https:\/\/newsnarad.com\/pa\/","nextItem":{"@type":"ListItem","@id":"https:\/\/newsnarad.com\/pa\/category\/ladakh\/#listItem","name":"\u0a32\u0a71\u0a26\u0a3e\u0a16"}},{"@type":"ListItem","@id":"https:\/\/newsnarad.com\/pa\/category\/ladakh\/#listItem","position":2,"name":"\u0a32\u0a71\u0a26\u0a3e\u0a16","item":"https:\/\/newsnarad.com\/pa\/category\/ladakh\/","nextItem":{"@type":"ListItem","@id":"https:\/\/newsnarad.com\/pa\/category\/ladakh\/leh\/#listItem","name":"\u0a32\u0a47\u0a39"},"previousItem":{"@type":"ListItem","@id":"https:\/\/newsnarad.com\/pa\/#listItem","name":"Home"}},{"@type":"ListItem","@id":"https:\/\/newsnarad.com\/pa\/category\/ladakh\/leh\/#listItem","position":3,"name":"\u0a32\u0a47\u0a39","item":"https:\/\/newsnarad.com\/pa\/category\/ladakh\/leh\/","nextItem":{"@type":"ListItem","@id":"https:\/\/newsnarad.com\/pa\/lreda-replaces-battery-of-solar-power-plants-at-lukung-spangmik\/#listItem","name":"LREDA replaces battery of solar power plants at Lukung, Spangmik"},"previousItem":{"@type":"ListItem","@id":"https:\/\/newsnarad.com\/pa\/category\/ladakh\/#listItem","name":"\u0a32\u0a71\u0a26\u0a3e\u0a16"}},{"@type":"ListItem","@id":"https:\/\/newsnarad.com\/pa\/lreda-replaces-battery-of-solar-power-plants-at-lukung-spangmik\/#listItem","position":4,"name":"LREDA replaces battery of solar power plants at Lukung, Spangmik","previousItem":{"@type":"ListItem","@id":"https:\/\/newsnarad.com\/pa\/category\/ladakh\/leh\/#listItem","name":"\u0a32\u0a47\u0a39"}}]},{"@type":"Organization","@id":"https:\/\/newsnarad.com\/pa\/#organization","name":"News Narad | \u0a28\u0a3f\u0a0a\u0a1c\u0a3c \u0a28\u0a3e\u0a30\u0a26 | \u0a09\u0a71\u0a24\u0a30 \u0a2d\u0a3e\u0a30\u0a24 \u0a26\u0a40\u0a06\u0a02 \u0a24\u0a3e\u0a1c\u0a3c\u0a3e \u0a16\u0a3c\u0a2c\u0a30\u0a3e\u0a02","description":"\u0a28\u0a3f\u0a0a\u0a1c\u0a3c \u0a28\u0a3e\u0a30\u0a26 | \u0a09\u0a71\u0a24\u0a30 \u0a2d\u0a3e\u0a30\u0a24 \u0a26\u0a40\u0a06\u0a02 \u0a24\u0a3e\u0a1c\u0a3c\u0a3e \u0a16\u0a3c\u0a2c\u0a30\u0a3e\u0a02 \u0a1c\u0a3f\u0a28\u0a4d\u0a39\u0a3e\u0a02 \u0a35\u0a3f\u0a71\u0a1a \u0a2a\u0a70\u0a1c\u0a3e\u0a2c, \u0a39\u0a30\u0a3f\u0a06\u0a23\u0a3e, \u0a39\u0a3f\u0a2e\u0a3e\u0a1a\u0a32 \u0a2a\u0a4d\u0a30\u0a26\u0a47\u0a38\u0a3c, \u0a2f\u0a42\u0a2a\u0a40, \u0a2c\u0a3f\u0a39\u0a3e\u0a30, \u0a1c\u0a70\u0a2e\u0a42 \u0a15\u0a38\u0a3c\u0a2e\u0a40\u0a30 \u0a30\u0a3e\u0a1c\u0a38\u0a25\u0a3e\u0a28, \u0a09\u0a71\u0a24\u0a30\u0a3e\u0a16\u0a70\u0a21, \u0a1a\u0a70\u0a21\u0a40\u0a17\u0a5c\u0a4d\u0a39, \u0a26\u0a3f\u0a71\u0a32\u0a40 \u0a10\u0a28\u0a38\u0a40\u0a06\u0a30 \u0a06\u0a26\u0a3f \u0a38\u0a3c\u0a3e\u0a2e\u0a32 \u0a39\u0a28","url":"https:\/\/newsnarad.com\/pa\/"},{"@type":"Person","@id":"https:\/\/newsnarad.com\/pa\/author\/akashkumarnm\/#author","url":"https:\/\/newsnarad.com\/pa\/author\/akashkumarnm\/","name":"Akash Kumar","image":{"@type":"ImageObject","@id":"https:\/\/newsnarad.com\/pa\/lreda-replaces-battery-of-solar-power-plants-at-lukung-spangmik\/#authorImage","url":"https:\/\/secure.gravatar.com\/avatar\/8fd96d9f44fb09010c9e10585f35b22db3480b9425d2f311f1e25dc1f861bf9d?s=96&d=mm&r=g","width":96,"height":96,"caption":"Akash Kumar"}},{"@type":"WebPage","@id":"https:\/\/newsnarad.com\/pa\/lreda-replaces-battery-of-solar-power-plants-at-lukung-spangmik\/#webpage","url":"https:\/\/newsnarad.com\/pa\/lreda-replaces-battery-of-solar-power-plants-at-lukung-spangmik\/","name":"LREDA replaces battery of solar power plants at Lukung, Spangmik - News Narad | \u0a28\u0a3f\u0a0a\u0a1c\u0a3c \u0a28\u0a3e\u0a30\u0a26 | \u0a09\u0a71\u0a24\u0a30 \u0a2d\u0a3e\u0a30\u0a24 \u0a26\u0a40\u0a06\u0a02 \u0a24\u0a3e\u0a1c\u0a3c\u0a3e \u0a16\u0a3c\u0a2c\u0a30\u0a3e\u0a02","description":"\u0a2e\u0a3e\u0a2b\u0a3c \u0a15\u0a30\u0a28\u0a3e, \u0a07\u0a39 \u0a16\u0a2c\u0a30 \u0a24\u0a41\u0a39\u0a3e\u0a21\u0a40 \u0a2c\u0a47\u0a28\u0a24\u0a40 \u0a2d\u0a3e\u0a38\u0a3c\u0a3e \u0a35\u0a3f\u0a71\u0a1a \u0a09\u0a2a\u0a32\u0a2c\u0a27 \u0a28\u0a39\u0a40\u0a02 \u0a39\u0a48\u0964 \u0a15\u0a3f\u0a30\u0a2a\u0a3e \u0a15\u0a30\u0a15\u0a47 \u0a07\u0a71\u0a25\u0a47 \u0a26\u0a47\u0a16\u0a4b\u0964Leh, July 2 2021 LREDA successfully placed a new battery bank set at the Solar Power Plant in Lukung and Spangmik under the Battery Replacement Scheme of solar power plants under the Special Development Package after being directed by Secretary, PDD,","inLanguage":"pa-IN","isPartOf":{"@id":"https:\/\/newsnarad.com\/pa\/#website"},"breadcrumb":{"@id":"https:\/\/newsnarad.com\/pa\/lreda-replaces-battery-of-solar-power-plants-at-lukung-spangmik\/#breadcrumblist"},"author":{"@id":"https:\/\/newsnarad.com\/pa\/author\/akashkumarnm\/#author"},"creator":{"@id":"https:\/\/newsnarad.com\/pa\/author\/akashkumarnm\/#author"},"image":{"@type":"ImageObject","url":"https:\/\/newsnarad.com\/wp-content\/uploads\/2021\/07\/Untitled-design-2021-07-05T152441.624.jpg","@id":"https:\/\/newsnarad.com\/pa\/lreda-replaces-battery-of-solar-power-plants-at-lukung-spangmik\/#mainImage","width":1280,"height":720},"primaryImageOfPage":{"@id":"https:\/\/newsnarad.com\/pa\/lreda-replaces-battery-of-solar-power-plants-at-lukung-spangmik\/#mainImage"},"datePublished":"2021-07-02T15:21:44+05:30","dateModified":"2021-07-05T15:25:04+05:30"},{"@type":"WebSite","@id":"https:\/\/newsnarad.com\/pa\/#website","url":"https:\/\/newsnarad.com\/pa\/","name":"News Narad | \u0a28\u0a3f\u0a0a\u0a1c\u0a3c \u0a28\u0a3e\u0a30\u0a26 | \u0a09\u0a71\u0a24\u0a30 \u0a2d\u0a3e\u0a30\u0a24 \u0a26\u0a40\u0a06\u0a02 \u0a24\u0a3e\u0a1c\u0a3c\u0a3e \u0a16\u0a3c\u0a2c\u0a30\u0a3e\u0a02","description":"\u0a28\u0a3f\u0a0a\u0a1c\u0a3c \u0a28\u0a3e\u0a30\u0a26 | \u0a09\u0a71\u0a24\u0a30 \u0a2d\u0a3e\u0a30\u0a24 \u0a26\u0a40\u0a06\u0a02 \u0a24\u0a3e\u0a1c\u0a3c\u0a3e \u0a16\u0a3c\u0a2c\u0a30\u0a3e\u0a02 \u0a1c\u0a3f\u0a28\u0a4d\u0a39\u0a3e\u0a02 \u0a35\u0a3f\u0a71\u0a1a \u0a2a\u0a70\u0a1c\u0a3e\u0a2c, \u0a39\u0a30\u0a3f\u0a06\u0a23\u0a3e, \u0a39\u0a3f\u0a2e\u0a3e\u0a1a\u0a32 \u0a2a\u0a4d\u0a30\u0a26\u0a47\u0a38\u0a3c, \u0a2f\u0a42\u0a2a\u0a40, \u0a2c\u0a3f\u0a39\u0a3e\u0a30, \u0a1c\u0a70\u0a2e\u0a42 \u0a15\u0a38\u0a3c\u0a2e\u0a40\u0a30 \u0a30\u0a3e\u0a1c\u0a38\u0a25\u0a3e\u0a28, \u0a09\u0a71\u0a24\u0a30\u0a3e\u0a16\u0a70\u0a21, \u0a1a\u0a70\u0a21\u0a40\u0a17\u0a5c\u0a4d\u0a39, \u0a26\u0a3f\u0a71\u0a32\u0a40 \u0a10\u0a28\u0a38\u0a40\u0a06\u0a30 \u0a06\u0a26\u0a3f \u0a38\u0a3c\u0a3e\u0a2e\u0a32 \u0a39\u0a28","inLanguage":"pa-IN","publisher":{"@id":"https:\/\/newsnarad.com\/pa\/#organization"}}]},"og:locale":"pa_IN","og:site_name":"News Narad | \u0a28\u0a3f\u0a0a\u0a1c\u0a3c \u0a28\u0a3e\u0a30\u0a26 | \u0a09\u0a71\u0a24\u0a30 \u0a2d\u0a3e\u0a30\u0a24 \u0a26\u0a40\u0a06\u0a02 \u0a24\u0a3e\u0a1c\u0a3c\u0a3e \u0a16\u0a3c\u0a2c\u0a30\u0a3e\u0a02 - \u0a28\u0a3f\u0a0a\u0a1c\u0a3c \u0a28\u0a3e\u0a30\u0a26 | \u0a09\u0a71\u0a24\u0a30 \u0a2d\u0a3e\u0a30\u0a24 \u0a26\u0a40\u0a06\u0a02 \u0a24\u0a3e\u0a1c\u0a3c\u0a3e \u0a16\u0a3c\u0a2c\u0a30\u0a3e\u0a02 \u0a1c\u0a3f\u0a28\u0a4d\u0a39\u0a3e\u0a02 \u0a35\u0a3f\u0a71\u0a1a \u0a2a\u0a70\u0a1c\u0a3e\u0a2c, \u0a39\u0a30\u0a3f\u0a06\u0a23\u0a3e, \u0a39\u0a3f\u0a2e\u0a3e\u0a1a\u0a32 \u0a2a\u0a4d\u0a30\u0a26\u0a47\u0a38\u0a3c, \u0a2f\u0a42\u0a2a\u0a40, \u0a2c\u0a3f\u0a39\u0a3e\u0a30, \u0a1c\u0a70\u0a2e\u0a42 \u0a15\u0a38\u0a3c\u0a2e\u0a40\u0a30 \u0a30\u0a3e\u0a1c\u0a38\u0a25\u0a3e\u0a28, \u0a09\u0a71\u0a24\u0a30\u0a3e\u0a16\u0a70\u0a21, \u0a1a\u0a70\u0a21\u0a40\u0a17\u0a5c\u0a4d\u0a39, \u0a26\u0a3f\u0a71\u0a32\u0a40 \u0a10\u0a28\u0a38\u0a40\u0a06\u0a30 \u0a06\u0a26\u0a3f \u0a38\u0a3c\u0a3e\u0a2e\u0a32 \u0a39\u0a28","og:type":"article","og:title":"LREDA replaces battery of solar power plants at Lukung, Spangmik - News Narad | \u0a28\u0a3f\u0a0a\u0a1c\u0a3c \u0a28\u0a3e\u0a30\u0a26 | \u0a09\u0a71\u0a24\u0a30 \u0a2d\u0a3e\u0a30\u0a24 \u0a26\u0a40\u0a06\u0a02 \u0a24\u0a3e\u0a1c\u0a3c\u0a3e \u0a16\u0a3c\u0a2c\u0a30\u0a3e\u0a02","og:description":"\u0a2e\u0a3e\u0a2b\u0a3c \u0a15\u0a30\u0a28\u0a3e, \u0a07\u0a39 \u0a16\u0a2c\u0a30 \u0a24\u0a41\u0a39\u0a3e\u0a21\u0a40 \u0a2c\u0a47\u0a28\u0a24\u0a40 \u0a2d\u0a3e\u0a38\u0a3c\u0a3e \u0a35\u0a3f\u0a71\u0a1a \u0a09\u0a2a\u0a32\u0a2c\u0a27 \u0a28\u0a39\u0a40\u0a02 \u0a39\u0a48\u0964 \u0a15\u0a3f\u0a30\u0a2a\u0a3e \u0a15\u0a30\u0a15\u0a47 \u0a07\u0a71\u0a25\u0a47 \u0a26\u0a47\u0a16\u0a4b\u0964Leh, July 2 2021 LREDA successfully placed a new battery bank set at the Solar Power Plant in Lukung and Spangmik under the Battery Replacement Scheme of solar power plants under the Special Development Package after being directed by Secretary, PDD,","og:url":"https:\/\/newsnarad.com\/pa\/lreda-replaces-battery-of-solar-power-plants-at-lukung-spangmik\/","article:published_time":"2021-07-02T09:51:44+00:00","article:modified_time":"2021-07-05T09:55:04+00:00","twitter:card":"summary_large_image","twitter:title":"LREDA replaces battery of solar power plants at Lukung, Spangmik - News Narad | \u0a28\u0a3f\u0a0a\u0a1c\u0a3c \u0a28\u0a3e\u0a30\u0a26 | \u0a09\u0a71\u0a24\u0a30 \u0a2d\u0a3e\u0a30\u0a24 \u0a26\u0a40\u0a06\u0a02 \u0a24\u0a3e\u0a1c\u0a3c\u0a3e \u0a16\u0a3c\u0a2c\u0a30\u0a3e\u0a02","twitter:description":"\u0a2e\u0a3e\u0a2b\u0a3c \u0a15\u0a30\u0a28\u0a3e, \u0a07\u0a39 \u0a16\u0a2c\u0a30 \u0a24\u0a41\u0a39\u0a3e\u0a21\u0a40 \u0a2c\u0a47\u0a28\u0a24\u0a40 \u0a2d\u0a3e\u0a38\u0a3c\u0a3e \u0a35\u0a3f\u0a71\u0a1a \u0a09\u0a2a\u0a32\u0a2c\u0a27 \u0a28\u0a39\u0a40\u0a02 \u0a39\u0a48\u0964 \u0a15\u0a3f\u0a30\u0a2a\u0a3e \u0a15\u0a30\u0a15\u0a47 \u0a07\u0a71\u0a25\u0a47 \u0a26\u0a47\u0a16\u0a4b\u0964Leh, July 2 2021 LREDA successfully placed a new battery bank set at the Solar Power Plant in Lukung and Spangmik under the Battery Replacement Scheme of solar power plants under the Special Development Package after being directed by Secretary, PDD,"},"aioseo_meta_data":{"post_id":"78420","title":null,"description":null,"keywords":null,"keyphrases":null,"primary_term":null,"canonical_url":null,"og_title":null,"og_description":null,"og_object_type":"default","og_image_type":"default","og_image_url":null,"og_image_width":null,"og_image_height":null,"og_image_custom_url":null,"og_image_custom_fields":null,"og_video":null,"og_custom_url":null,"og_article_section":null,"og_article_tags":null,"twitter_use_og":false,"twitter_card":"default","twitter_image_type":"default","twitter_image_url":null,"twitter_image_custom_url":null,"twitter_image_custom_fields":null,"twitter_title":null,"twitter_description":null,"schema":{"blockGraphs":[],"customGraphs":[],"default":{"data":{"Article":[],"Course":[],"Dataset":[],"FAQPage":[],"Movie":[],"Person":[],"Product":[],"ProductReview":[],"Car":[],"Recipe":[],"Service":[],"SoftwareApplication":[],"WebPage":[]},"graphName":"","isEnabled":true},"graphs":[]},"schema_type":"default","schema_type_options":null,"pillar_content":false,"robots_default":true,"robots_noindex":false,"robots_noarchive":false,"robots_nosnippet":false,"robots_nofollow":false,"robots_noimageindex":false,"robots_noodp":false,"robots_notranslate":false,"robots_max_snippet":null,"robots_max_videopreview":null,"robots_max_imagepreview":"large","priority":null,"frequency":null,"local_seo":null,"breadcrumb_settings":null,"limit_modified_date":false,"ai":null,"created":"2025-03-11 00:57:37","updated":"2025-06-06 20:42:41","seo_analyzer_scan_date":null,"focus_keyword":null,"additional_keywords":null,"truseo_locale":null},"aioseo_breadcrumb":"<div class=\"aioseo-breadcrumbs\"><span class=\"aioseo-breadcrumb\">\n\t\t\t<a href=\"https:\/\/newsnarad.com\/pa\/\" title=\"Home\">Home<\/a>\n\t\t<\/span><span class=\"aioseo-breadcrumb-separator\">\u00bb<\/span><span class=\"aioseo-breadcrumb\">\n\t\t\t<a href=\"https:\/\/newsnarad.com\/pa\/category\/ladakh\/\" title=\"\u0a32\u0a71\u0a26\u0a3e\u0a16\">\u0a32\u0a71\u0a26\u0a3e\u0a16<\/a>\n\t\t<\/span><span class=\"aioseo-breadcrumb-separator\">\u00bb<\/span><span class=\"aioseo-breadcrumb\">\n\t\t\t<a href=\"https:\/\/newsnarad.com\/pa\/category\/ladakh\/leh\/\" title=\"\u0a32\u0a47\u0a39\">\u0a32\u0a47\u0a39<\/a>\n\t\t<\/span><span class=\"aioseo-breadcrumb-separator\">\u00bb<\/span><span class=\"aioseo-breadcrumb\">\n\t\t\tLREDA replaces battery of solar power plants at Lukung, Spangmik\n\t\t<\/span><\/div>","aioseo_breadcrumb_json":[{"label":"Home","link":"https:\/\/newsnarad.com\/pa\/"},{"label":"\u0a32\u0a71\u0a26\u0a3e\u0a16","link":"https:\/\/newsnarad.com\/pa\/category\/ladakh\/"},{"label":"\u0a32\u0a47\u0a39","link":"https:\/\/newsnarad.com\/pa\/category\/ladakh\/leh\/"},{"label":"LREDA replaces battery of solar power plants at Lukung, Spangmik","link":"https:\/\/newsnarad.com\/pa\/lreda-replaces-battery-of-solar-power-plants-at-lukung-spangmik\/"}],"_links":{"self":[{"href":"https:\/\/newsnarad.com\/pa\/wp-json\/wp\/v2\/posts\/78420","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/newsnarad.com\/pa\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/newsnarad.com\/pa\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/newsnarad.com\/pa\/wp-json\/wp\/v2\/users\/14"}],"replies":[{"embeddable":true,"href":"https:\/\/newsnarad.com\/pa\/wp-json\/wp\/v2\/comments?post=78420"}],"version-history":[{"count":0,"href":"https:\/\/newsnarad.com\/pa\/wp-json\/wp\/v2\/posts\/78420\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/newsnarad.com\/pa\/wp-json\/wp\/v2\/media\/78422"}],"wp:attachment":[{"href":"https:\/\/newsnarad.com\/pa\/wp-json\/wp\/v2\/media?parent=78420"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/newsnarad.com\/pa\/wp-json\/wp\/v2\/categories?post=78420"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/newsnarad.com\/pa\/wp-json\/wp\/v2\/tags?post=78420"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}